APICS CPIM - PART 2 PRE-TEST
Machine utilization can be increased by: - answer reducing unplanned downtime.
A compound used to clean manufacturing equipment would be classified as which of
the following types of inventory? - answer Maintenance, repair, and operating supplies
Mean time to repair (MTTR) is the average time: - answerof product repair.
Which of the following distribution lead time elements is a determinant of when a truck is
loaded during the daily schedule for delivery of goods to a particular store? -
answerTransportation distance
Performance measurements and objectives should be aligned to the company's: -
answerstrategy.
In a make-to-order (MTO) environment, master scheduling should take place at which of
the following levels? - answerRaw material
What is the rule for using net present value for project justification? - answerIf the net
present value is positive, accept the project. Otherwise, reject it.
Which of the following is the most appropriate first step in managing risk? -
answerIdentify the potential causes of failure.
Which of the following business characteristics would typically make a lead capacity
strategy appropriate? - answerCapacity can be activated or deactivated in increments.
Why must top management coordinate with each other? - answerSo that diverse groups
such as creative teams and rules-based teams operate with a common purpose
Which of the following best describes the results of total quality control? - answerThe
product meets the expectations of the customer.
Aggregate inventory management establishes the overall level of inventory desired: -
answerin monetary units.
Utilization of assets in distribution can be measured by the ratio of: - answercubic
volume used to cubic volume available.
Design for manufacturability should result in which of the following? - answerImproved
product quality
Machine utilization can be increased by: - answer reducing unplanned downtime.
A compound used to clean manufacturing equipment would be classified as which of
the following types of inventory? - answer Maintenance, repair, and operating supplies
Mean time to repair (MTTR) is the average time: - answerof product repair.
Which of the following distribution lead time elements is a determinant of when a truck is
loaded during the daily schedule for delivery of goods to a particular store? -
answerTransportation distance
Performance measurements and objectives should be aligned to the company's: -
answerstrategy.
In a make-to-order (MTO) environment, master scheduling should take place at which of
the following levels? - answerRaw material
What is the rule for using net present value for project justification? - answerIf the net
present value is positive, accept the project. Otherwise, reject it.
Which of the following is the most appropriate first step in managing risk? -
answerIdentify the potential causes of failure.
Which of the following business characteristics would typically make a lead capacity
strategy appropriate? - answerCapacity can be activated or deactivated in increments.
Why must top management coordinate with each other? - answerSo that diverse groups
such as creative teams and rules-based teams operate with a common purpose
Which of the following best describes the results of total quality control? - answerThe
product meets the expectations of the customer.
Aggregate inventory management establishes the overall level of inventory desired: -
answerin monetary units.
Utilization of assets in distribution can be measured by the ratio of: - answercubic
volume used to cubic volume available.
Design for manufacturability should result in which of the following? - answerImproved
product quality