ICC EXAM STUDY GUIDE 2026/2027 COMPLETE QUESTIONS WITH VERIFIED CORRECT ANSWERS || 100% GUARANTEED PASS NEWEST VERSION

Document preview thumbnail
Preview 4 out of 31 pages

ICC EXAM STUDY GUIDE 2026/2027 COMPLETE QUESTIONS WITH VERIFIED CORRECT ANSWERS || 100% GUARANTEED PASS NEWEST VERSION 1. It is the responsibility of the ______________ to monitor the special inspection activities. - ANSWER The building official 2. The ______________ is responsible for approving the special inspection program. - ANSWER The building official 3. Who does the special inspector notify first if there is a non-conforming item? - ANSWER The inspection supervisor 4. How often does the special inspector submit reports to the building official? - ANSWER As determined by the building official 5. Who establishes the special inspection program? - ANSWER The building department 6. Who submits the statement of responsibility? - ANSWER The contractor 7. Who produces the statement of responsibility? - ANSWER The contractor 8. A preconstruction meeting is: - ANSWER Initiated by the general contractor 9. The responsibility of ensuring that day to day work is covered by inspections falls on - ANSWER The contractor 10. Who performs a structural observation? A) the RDP in responsible charge B) The special inspector C) The contractor D) The building official - ANSWER A) the RDP in responsible charge 11. What does a special inspector's job NOT entail while on the job site? A) instructing the contractor;s workers on how to do their job B) Verify means and methods of construction C) Inform the contractor of arrival D) Discuss with the contractor any discrepancies as they may come up later in a lawsuit - ANSWER A) Instructing the contractor's workers on how to their job 12. What should a special inspector NOT do prior to arriving to the jobsite? A) Attend a preconstruction meeting B) Review the construction documents C) Discuss frequency of reports with the building official D) Ask any questions you may have - ANSWER A) Attend a preconstruction meeting 13. Which of the following should a special inspector contact the contractor about immediately? A) If the concrete temperature is 80 degrees B) If the slump calls for a maximum of 4' but is 6' C) If the air content calls for 6% but is 3% D) If the steel isn't tied properly - ANSWER B and C 14. who shall prepare the statement of special inspection? a.)building official b.)owner c.)registered design professional d.)approved inspection agency - ANSWER c.) registered design professional 15. an evaluation report... a.) is issued by the special inspector on the performance of a building product b.) presents the findings of a technical evaluation of a building product, certifying the products compliance with the code requirements c.) is issued by the registered design professional, verifying the product meets the specifications from the manufacturer d.) presents the means and methods of the contractor as to how a building product will be incorporated - ANSWER b.) presents the findings of a technical evaluation of a building product, certifying the products compliance with the code requirements 16. who can issue a stop work order? a.) special inspector b.)registered design professional c.)building official d.) approved inspection agency - ANSWER c.) building official 17. work that usually requires special inspection in the field but is instead performed off-site on the premises of a fabricator during fabrication... a.) always requires special inspection b.)never requires special inspection c.) does not require special inspection if the fabricator is registered and approved d.) special inspection is at the discretion of the contractor - ANSWER c.) does not require special inspection if the fabricator is registered and approved 18. all of the following should be on a daily report except... a.) astm standard for any testing performed b.) location of the inspection c.) type of inspection d.) documentation of any changes per RFI's - ANSWER a.) astm standard for any testing performed. 19. the final report shall be submitted... a.) within 2 weeks of job completion b.) at a point in time agreed upon by the owner and approved inspection agency c.) at a point in time agreed upon by the owner and building official d.) within 30 days of job completion - ANSWER c.) at a point in time agreed upon by the owner and building official

Content preview

ICC EXAM STUDY GUIDE 2026/2027
COMPLETE QUESTIONS WITH
VERIFIED CORRECT ANSWERS ||
100% GUARANTEED PASS
<NEWEST VERSION>



1. It is the responsibility of the ______________ to monitor the special
inspection activities. - ANSWER ✔ The building official


2. The ______________ is responsible for approving the special inspection
program. - ANSWER ✔ The building official


3. Who does the special inspector notify first if there is a non-conforming
item? - ANSWER ✔ The inspection supervisor


4. How often does the special inspector submit reports to the building official?
- ANSWER ✔ As determined by the building official


5. Who establishes the special inspection program? - ANSWER ✔ The
building department


6. Who submits the statement of responsibility? - ANSWER ✔ The contractor

,7. Who produces the statement of responsibility? - ANSWER ✔ The contractor


8. A preconstruction meeting is: - ANSWER ✔ Initiated by the general
contractor


9. The responsibility of ensuring that day to day work is covered by inspections
falls on - ANSWER ✔ The contractor


10.Who performs a structural observation?
A) the RDP in responsible charge
B) The special inspector
C) The contractor
D) The building official - ANSWER ✔ A) the RDP in responsible charge


11.What does a special inspector's job NOT entail while on the job site?
A) instructing the contractor;s workers on how to do their job
B) Verify means and methods of construction
C) Inform the contractor of arrival
D) Discuss with the contractor any discrepancies as they may come up
later in a lawsuit - ANSWER ✔ A) Instructing the contractor's
workers on how to their job


12.What should a special inspector NOT do prior to arriving to the jobsite?
A) Attend a preconstruction meeting
B) Review the construction documents
C) Discuss frequency of reports with the building official
D) Ask any questions you may have - ANSWER ✔ A) Attend a
preconstruction meeting

,13.Which of the following should a special inspector contact the contractor
about immediately?
A) If the concrete temperature is 80 degrees
B) If the slump calls for a maximum of 4' but is 6'
C) If the air content calls for 6% but is 3%
D) If the steel isn't tied properly - ANSWER ✔ B and C


14.who shall prepare the statement of special inspection?


a.)building official
b.)owner
c.)registered design professional
d.)approved inspection agency - ANSWER ✔ c.) registered design
professional


15.an evaluation report...


a.) is issued by the special inspector on the performance of a
building product
b.) presents the findings of a technical evaluation of a building
product, certifying the products compliance with the code
requirements
c.) is issued by the registered design professional, verifying the
product meets the specifications from the manufacturer
d.) presents the means and methods of the contractor as to how a
building product will be incorporated - ANSWER ✔ b.)
presents the findings of a technical evaluation of a building
product, certifying the products compliance with the code
requirements


16.who can issue a stop work order?

, a.) special inspector
b.)registered design professional
c.)building official
d.) approved inspection agency - ANSWER ✔ c.) building official


17.work that usually requires special inspection in the field but is instead
performed off-site on the premises of a fabricator during fabrication...


a.) always requires special inspection
b.)never requires special inspection
c.) does not require special inspection if the fabricator is registered and
approved
d.) special inspection is at the discretion of the contractor - ANSWER ✔ c.)
does not require special inspection if the fabricator is registered and
approved


18.all of the following should be on a daily report except...


a.) astm standard for any testing performed
b.) location of the inspection
c.) type of inspection
d.) documentation of any changes per RFI's - ANSWER ✔ a.)
astm standard for any testing performed.


19.the final report shall be submitted...


a.) within 2 weeks of job completion
b.) at a point in time agreed upon by the owner and approved
inspection agency

Document information

Uploaded on
March 29, 2026
Number of pages
31
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin
3.7
(153)
Sold
774
Followers
19
Items
4034
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions