1. It is the responsibility of the ______________ to monitor the special
inspection activities. - ANSWER ✔ The building official
2. The ______________ is responsible for approving the special inspection
program. - ANSWER ✔ The building official
3. Who does the special inspector notify first if there is a non-conforming
item? - ANSWER ✔ The inspection supervisor
4. How often does the special inspector submit reports to the building official?
- ANSWER ✔ As determined by the building official
5. Who establishes the special inspection program? - ANSWER ✔ The
building department
6. Who submits the statement of responsibility? - ANSWER ✔ The contractor
,7. Who produces the statement of responsibility? - ANSWER ✔ The contractor
8. A preconstruction meeting is: - ANSWER ✔ Initiated by the general
contractor
9. The responsibility of ensuring that day to day work is covered by inspections
falls on - ANSWER ✔ The contractor
10.Who performs a structural observation?
A) the RDP in responsible charge
B) The special inspector
C) The contractor
D) The building official - ANSWER ✔ A) the RDP in responsible charge
11.What does a special inspector's job NOT entail while on the job site?
A) instructing the contractor;s workers on how to do their job
B) Verify means and methods of construction
C) Inform the contractor of arrival
D) Discuss with the contractor any discrepancies as they may come up
later in a lawsuit - ANSWER ✔ A) Instructing the contractor's
workers on how to their job
12.What should a special inspector NOT do prior to arriving to the jobsite?
A) Attend a preconstruction meeting
B) Review the construction documents
C) Discuss frequency of reports with the building official
D) Ask any questions you may have - ANSWER ✔ A) Attend a
preconstruction meeting
,13.Which of the following should a special inspector contact the contractor
about immediately?
A) If the concrete temperature is 80 degrees
B) If the slump calls for a maximum of 4' but is 6'
C) If the air content calls for 6% but is 3%
D) If the steel isn't tied properly - ANSWER ✔ B and C
14.who shall prepare the statement of special inspection?
a.)building official
b.)owner
c.)registered design professional
d.)approved inspection agency - ANSWER ✔ c.) registered design
professional
15.an evaluation report...
a.) is issued by the special inspector on the performance of a
building product
b.) presents the findings of a technical evaluation of a building
product, certifying the products compliance with the code
requirements
c.) is issued by the registered design professional, verifying the
product meets the specifications from the manufacturer
d.) presents the means and methods of the contractor as to how a
building product will be incorporated - ANSWER ✔ b.)
presents the findings of a technical evaluation of a building
product, certifying the products compliance with the code
requirements
16.who can issue a stop work order?
, a.) special inspector
b.)registered design professional
c.)building official
d.) approved inspection agency - ANSWER ✔ c.) building official
17.work that usually requires special inspection in the field but is instead
performed off-site on the premises of a fabricator during fabrication...
a.) always requires special inspection
b.)never requires special inspection
c.) does not require special inspection if the fabricator is registered and
approved
d.) special inspection is at the discretion of the contractor - ANSWER ✔ c.)
does not require special inspection if the fabricator is registered and
approved
18.all of the following should be on a daily report except...
a.) astm standard for any testing performed
b.) location of the inspection
c.) type of inspection
d.) documentation of any changes per RFI's - ANSWER ✔ a.)
astm standard for any testing performed.
19.the final report shall be submitted...
a.) within 2 weeks of job completion
b.) at a point in time agreed upon by the owner and approved
inspection agency