Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Unit 11:CON 1200 Unit 11- Informing Industry: Publicizing Contract Actions:100% Verified Questions & Answers

Document preview thumbnail
Preview 2 out of 6 pages

Fill in the two blanks with one of the alternatives to the following sentence: "To help ensure competition, all proposed acquisitions expected to exceed _______, but not expected to exceed _________ must be displayed in a public place or by an appropriate electronic means for at least 10 days." $15,000; $25,000 Feedback:Correct, see FAR 5.101(a)(2). See U11, Lesson 02. $25,000; $100,000 $10,000; $25,000 $10,000; $15,000 Correct 2/2 Points 2. You are the contracting specialist working in the installation contracting office. This morning you received two (2) purchase request packages. One is a requirement for a specialized tool used by the installation civil engineer electrical shop with an estimated price of $17,250. The other is a requirement for repair of the main power supply unit on the base radar site with an estimated price of $53,550. You analyze both requirements to determine their publicizing needs. According to FAR 5.101, which two (2) of the following is a true statement regarding the results of your analysis of each PR Package? Select the two answers that apply. You can post the special tool requirement in a public place or electronically. Feedback: Correct, see FAR 5.101(a). See U11, Lesson 02 and Lesson 05. The power supply repair only requires publication in a public place or electronically. Both requirements must be publicized on the GPE for at least 15 days. You must publicize the power supply repair requirement in the GPE.Feedback: Correct, see FAR 5.101(a). See U11, Lesson 02 and Lesson 05. Correct 1/1 Points 3. Where are the exceptions to publicizing contract actions found? DFARS 205.202 FAR 5.201

Content preview

CON 1200 Unit 11 Informing Industry: Publicizing Contract
Actions
Points: 23/25




Correct 2/2 Points

1. Fill in the two blanks with one of the alternatives to the following sentence: "To help ensure
competition, all proposed acquisitions expected to exceed _______, but not expected to exceed
_________ must be displayed in a public place or by an appropriate electronic means for at least
10 days."

$15,000; $25,000
Feedback:Correct, see FAR 5.101(a)(2). See U11, Lesson 02.

$25,000; $100,000

$10,000; $25,000

$10,000; $15,000




Correct 2/2 Points

2. You are the contracting specialist working in the installation contracting office. This morning
you received two (2) purchase request packages. One is a requirement for a specialized tool
used by the installation civil engineer electrical shop with an estimated price of $17,250. The
other is a requirement for repair of the main power supply unit on the base radar site with an
estimated price of $53,550. You analyze both requirements to determine their publicizing needs.

According to FAR 5.101, which two (2) of the following is a true statement regarding the results
of your analysis of each PR Package? Select the two answers that apply.

You can post the special tool requirement in a public place or electronically.
Feedback: Correct, see FAR 5.101(a). See U11, Lesson 02 and Lesson 05.

The power supply repair only requires publication in a public place or electronically.

Both requirements must be publicized on the GPE for at least 15 days.

You must publicize the power supply repair requirement in the GPE.

, Feedback: Correct, see FAR 5.101(a). See U11, Lesson 02 and Lesson 05.




Correct 1/1 Points

3. Where are the exceptions to publicizing contract actions found?

DFARS 205.202

FAR 5.201

FAR 5.202
Feedback: Correct, see FAR 5.202 Exceptions. See U11, Lesson 04

DFARS 205.201




Correct 2/2 Points

4. Scenario 1: You have a requirement for a sole-source noncommercial supply item estimated at
$250,000.

What method of publication is required?

Posted on the GPE
Feedback: Correct, see FAR 5.101(a)(1). See U11, Lessons 02 and 05.

No posting required for that dollar value

Public or electronic posting




Correct 2/2 Points

5. Scenario 1: You have a requirement for a sole-source, noncommercial supply item estimated at
$250,000.

How many days must the contract action be publicized prior to issuance of the solicitation?



30 Days

Document information

Uploaded on
March 29, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$9.80

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Joy100
4.2
(397)
Sold
2682
Followers
2240
Items
3675
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions