Exam (elaborations)

NCIDQ Exam Questions with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Document preview thumbnail
Preview 3 out of 17 pages

NCIDQ Exam Questions with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Content preview

NCIDQ Exam Questions with all Correct & 100%
Verified Answers |Latest Version |Already Graded A+

Most church plans are based on the design principle
A) Balance
B) Rhythm
C) Variety
D) Proportion ✔Correct Answer-A) Balance

Which of the following is a true statement about the difference between a programmatic concept
and a design concept?
A)A design concept specifies a particular way to achieve the programmatic concept
B) There are many more programmatic concepts for a problem than there are design concept
C) A design concept is a performance requirement
Design concepts are developed before programmatic concepts ✔Correct Answer-A) A design
concept specifies a particular way to achieve the programmatic concept

Which of the following is the MOST cost effective construction element for defining a space?
A)Raised platform
B)Gypsum wallboard partition
C) oversized door
D) glazed wall ✔Correct Answer-C) oversized door

A building interior is being planned that will include an atrium. Which of the following organizational
schemes does this Most strongly suggest?
A)axial
B)grid
C)radial
D)central ✔Correct Answer-D)central

Which of the following are critical planning concerns for a commercial office space? (Choose the four
that apply)
A)adjacencies
B)daylighting
C) means of egress
D) plan type
E) efficiency factor
F) column locations ✔Correct Answer-A)adjacencies
B)daylighting
C) means of egress
E) efficiency factor

Which of the following plan arrangements would be Most appropriate for the entry, nave, altar, and
choir of a church that is moving into an existing rectangular space?
A)axial
B)clustered
C)linear
D)open ✔Correct Answer-A)axial

,A restaurant in an old building is undergoing remodeling. Which of the following existing building
elements would have the MOST influence over the space plan for the proposed dining area?
A) loadbearing columns and interior walls
B)building dimensions
C)plumbing fixtures
D)decorative millwork and ornate lighting fixtures ✔Correct Answer-B)building dimensions

A designer has determined the a client needs about 8000 ft2 of usable office space. The leasing
agent for the building says that the retable usable ratio will be 1.25. Approximately how much area
should the interior designer recommend that the client lease?
A) 7,500 ft2
B)10,000 ft2
C)10,700 ft2
D)13,300 ft2 ✔Correct Answer-B)10,000 ft2

When developing adjacency requirements, the interior designer must consider
A)contacts between people, transfer of objects, and electronics information
B)outside contacts with service people and visitors, as well as internal contacts
C)shared equipment and transfer of objects between people
D)frequency of required contacts between people and transfer of objects ✔Correct Answer-
A)contacts between people, transfer of objects, and electronics information

The BEST way to gather programming information from workers in a large office is through
A)observation
B)questionnaires
C)interviews
D)benchmarks ✔Correct Answer-C)interviews

A library is being designed to occupy only one portion of a building, a complete set of drawings is
available for the building. What information would be the MOST important to obtain from the field
survey?
A)locations of structural elements
B)existing natural light sources
C) sources of noise within the building
D)locations and capacities of electrical power ✔Correct Answer-C) sources of noise within the
building

A residential design involves a bedroom, bath, and garage addition. At a minimum, the due diligence
site investigation should include
A)neighborhood character and zoning setbacks
B) zoning setbacks and septic capacities
C)heating system capacity and neighborhood traffic
D)zoning height limitations and street characteristics ✔Correct Answer-B) zoning setbacks and
septic capacities

Understanding a client's sustainability goals when looking for office space will help the interior
designer
A)determine if the project can be LEED certified
B)review the energy conservation of the mechanical system
C) determine if the building can be located in a brownfield site

, D) focus site analyses on features that support sustainable design ✔Correct Answer-D) focus site
analyses on features that support sustainable design

What existing condition in a building would MOST affect the cost of a new interior design?
A)location of exits
B)limited views and daylight
C)lack of a sprinkler system
D) remote location of an electrical closet ✔Correct Answer-C)lack of a sprinkler system

Which of the following constitutes due diligence in the field of interior design
A)thoroughly understanding and documenting the space in which a client's project will be located
and its surrounding context
B) reviewing the legal and regulatory components of a new project before design begins
C) using qualified structural, engineering, and fire protection consultants to investigate an existing
space before design begins
D) reviewing and verifying site conditions that the client has reported to the interior designer
✔Correct Answer-A)thoroughly understanding and documenting the space in which a client's project
will be located and its surrounding context

Which of the following facts about the surrounding neighborhood are relevant to whether a building
can achieve that LEED for Commercial Interiors (LEED-CI) certification? (Choose the four that apply)
A)All surrounding streets are collector or arterial
B) The building is in a high-density, walkable community
C) The number of guaranteed tenant parking spaces is the minimum allowed by zoning requirements
D) The site has sufficient access to sunlight from the south
E) The site has sufficient bicycle facilities
F) Public transportation is located within 1/4 mile of the project site ✔Correct Answer-B) The
building is in a high-density, walkable community
C) The number of guaranteed tenant parking spaces is the minimum allowed by zoning requirements
E) The site has sufficient bicycle facilities
F) Public transportation is located within 1/4 mile of the project site

Which are the MOST important factors in determining the space required for a nurses' station in a
hospital?
A)number of patient contacts and files
B) work surface and storage requirements
C)number of moveable carts and space requirements for writing reports
D)electrical and communication equipment requirements ✔Correct Answer-B) work surface and
storage requirements

In investigating the existing conditions of an older building before beginning space planning, a project
manager would probably need to seek expert consulting assistance to determine the
A)number of supply air diffusers in the space
B)existence of floor-mounted electrical outlets in an open space
C)presence of adequate water pressure to add a sink in a washroom
D)feasibility of opening a double wide doorway in an existing load bearing wall ✔Correct Answer-
D)feasibility of opening a double wide doorway in an existing load bearing wall

In the five-step programming process outlined by the book, Problem Seeking, the fifth step is to state
the problem. What is the order of the first four steps?
A)determine needs, collect and analyze facts, uncover and test concepts, establish goals

Document information

Uploaded on
March 29, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Stuvia2026
2.3
(3)
Sold
26
Followers
1
Items
6351
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions