704 - correct answer ✔EC1, Controlled Track, Short term work, No Trains
Ote - correct answer ✔On track equipment
707 - correct answer ✔Controlled track, long term work, call in 15 hour before work starts, conditional
stop, Can have trains, permission from dispatch
ITD - correct answer ✔Individual train detection
Critical asset - correct answer ✔Permanent structures
SOTS form - correct answer ✔Statement of on track safety
PDS - correct answer ✔Predetermined place of safety
705.1 - correct answer ✔ITD, SOTS required, Hand tools only, lone worker, can't work in an interlocking
control point or a remote control hump yard
705.3 - correct answer ✔Train approach warning, 1 designated watchmen, working radio
705.8 - correct answer ✔Train coordination, train is stopped, can't release his authority, verify no other