Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

CERTIFIED STORM WATER OPERATOR PRACTICE EXAMINATION 2026 QUESTIONS WITH ANSWERS GRADED A+

Document preview thumbnail
Preview 3 out of 25 pages

CERTIFIED STORM WATER OPERATOR PRACTICE EXAMINATION 2026 QUESTIONS WITH ANSWERS GRADED A+

Content preview

CERTIFIED STORM WATER OPERATOR
PRACTICE EXAMINATION 2026
QUESTIONS WITH ANSWERS GRADED A+

◍ ____________________ lines connect points of equal surface elevations.
(Unit 4).
Answer: Contour.
◍ The effects of _____________ erosion are usually more visible than
_____________ erosion. (Unit 1).
Answer: Water; wind
◍ If there is a spill or release to waters of state....
Answer: -Contact EGLE's Pollution Emergency Alerting System (PEAS)
during non business hours-Regular business hours, contact local EGLE
district office-Cant just leave voice mail!!!-Also contact LEPC
◍ Soil erosion prevention and sedimentation control requires thoughtful
_______________ to be effective. (Unit 4).
Answer: Planning.
◍ Outfall.
Answer: The location at which a point source discharge enters the surface
waters of the state
◍ The primary goal of Part 91 (of the NREPA) is to protect _____________
properties and the ______________ of the state from
____________________ generated from unchecked erosion. (Unit 5).
Answer: Adjacent, waters, sediment.
◍ _____________ erosion is the removal of a uniform layer of soil from
rain-splash and storm water runoff. (Unit 1).

, Answer: Sheet
◍ Significant Materials.
Answer: Any material that can degrade or impair the water quality
◍ Groughty soil can be corrected by:- selecting ______________ resistant
plants- ____ silt and clay soil or _____________ matter with the droughty
soil. (Unit 3).
Answer: - Drought- Mix, organic.
◍ Goal of Storm Water.
Answer: Reduce Pollution-Store inventory inside-Use less toxic chemicals
in operation-Facility assessments-Current Inventory
◍ EGLE.
Answer: Administer CWA and issue NPDES permits
◍ Owners of projects that disturb _____ acres or more of land that have a
point source discharge to surface waters of the state must submit a
_____________ ___ ________________ _______ [along with other require
documents and fees] to the MDNRE to receive coverage under
Permit-by-Rule. The permittee must also comply with the requirements of
Permit-by-Rule..
Answer: 5, Notice of Coverage (NOC)
◍ Immediately following seeding, a mulch of clean straw should be applied at
____________ tons/acre. (Unit 3).
Answer: Two.
◍ The three common ways to express slope on a plan or map are as a
_________, a ______________, or in ______________. (Unit 4).
Answer: Ratio, percent, degrees.
◍ How should you see what chemicals have potential for exposure from spill?.
Answer: -Look at lists of lists and cross reference with materials we have on
site and make a list
◍ MiWaters.

, Answer: -New information system for web-based permitting and compliance
database
◍ For sites disturbing ___ ___ _______ _______,
_________________________ _________________ ______ _____
___________________ _________ ___ ______________ ____
_________________ to the MDEQ or when the SESC permit ___________
or ____ years from the start of the project, whichever is sooner..
Answer: 5 or more acres, Permit-by-Rule terminates when the permittee
sends a Notice or Termination, expires, 5
◍ A _______________________ meeting between the inspector, permittee,
contractor, project engineer, and the SESC agent can eliminate many
potential problems. (Unit 4).
Answer: Pre-construction.
◍ Pathogens.
Answer: -Inhibits recreational uses-can cause ear and or intestinal
problems-Sources are sanitary sewer overflows, animal waste, failing septic
systems
◍ A 50 pound bag of 20-10-5 contains __________ pounds of phosphorous.
(Unit 3).
Answer: Five
◍ A SESC permit and plan is required, at a minimum for all earth changes that
disturb ____ or more acres or that are located within ____ feet of the water's
edge of a _______ or __________. (Unit 4).
Answer: One, 500, lake, stream.
◍ 3 Criteria to consider when determining if coverage is needed under NPDES
ISW Permit.
Answer: 1. Standard Industrial Classification (SIC code) - see if regulated
by EPA based on products company makes2. Do we discharge to surface
waters of state? -where is water going? point source discharge?3. Potential
for Exposure - if you dont think you have anything, you need a No Exposure

Document information

Uploaded on
March 26, 2026
Number of pages
25
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(12)
Sold
161
Followers
4
Items
53160
Last sold
15 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions