Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

NCCCO lift planning Questions And Answers.

Document preview thumbnail
Preview 1 out of 3 pages

lift planning steps - Answer 1 determine the lift required 2 determine the load weight 3 verify the proper crane has been selected for the load and configuration. 4 set up the crane in the configuration needed 5 secure and mark the working area of the crane 6 perform pre-operational equipment check 7 perform a dry run (no load) and verify the configuration with maximum height and radius you would be using. 8 verify the lifting solution 9 make your lift Types of Lifts - Answer 1 Repetitive or simple lift ; load is easily within the limits of the crane, wire rope, hook, and rigging. 2 A planned lift ; requires some calculations by the operator for capacity, hazards, or rigging. 3 Critical lift; are done under special circumstances that require a written lift plan be done prior to the lift. Critical lifts - Answer 1 exceeding 75% or more of your crane's rated capacity in the configuration. 2 Placing the load on an occupied structure or carrying the load over an occupied structure. 3 load has a high dollar value 4 Two cranes are hoisting the same load(multi-crane) 5 Whenever you hoist personnel 6 The load has along lead time for replacement. Multi-crane lifts (tandem or multiple crane lift) - Answer 1 Follow the critical lift plan for the lift 2 Both cranes must be able to handle the load weight (75% of the load at a minimum) and the weight will shift to the tail crane as the load is elevated 3 Largest risk is side loading the booms 4 lifting at 90 degrees to each other will minimize the potential for side loading 5 know who the designated person is, who is responsible for the lift including planning, rigging, and instruction. 6 follow instructions of the head crane operator once the lift has begun

Content preview

NCCCO lift planning Questions And
Answers.
lift planning steps - Answer 1 determine the lift required

2 determine the load weight

3 verify the proper crane has been selected for the load and configuration.

4 set up the crane in the configuration needed

5 secure and mark the working area of the crane

6 perform pre-operational equipment check

7 perform a dry run (no load) and verify the configuration with maximum height and radius you
would be using.

8 verify the lifting solution

9 make your lift



Types of Lifts - Answer 1 Repetitive or simple lift ; load is easily within the limits of the crane,
wire rope, hook, and rigging.

2 A planned lift ; requires some calculations by the operator for capacity, hazards, or rigging.

3 Critical lift; are done under special circumstances that require a written lift plan be done prior
to the lift.



Critical lifts - Answer 1 exceeding 75% or more of your crane's rated capacity in the
configuration.

2 Placing the load on an occupied structure or carrying the load over an occupied structure.

3 load has a high dollar value

4 Two cranes are hoisting the same load(multi-crane)

5 Whenever you hoist personnel

6 The load has along lead time for replacement.



Multi-crane lifts (tandem or multiple crane lift) - Answer 1 Follow the critical lift plan for the
lift

2 Both cranes must be able to handle the load weight (75% of the load at a minimum) and the
weight will shift to the tail crane as the load is elevated

3 Largest risk is side loading the booms

4 lifting at 90 degrees to each other will minimize the potential for side loading

5 know who the designated person is, who is responsible for the lift including planning, rigging,
and instruction.

6 follow instructions of the head crane operator once the lift has begun

Document information

Uploaded on
March 19, 2026
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9
3.5
(167)
Sold
962
Followers
128
Items
30849
Last sold
10 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions