• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 116 pages
Exam (elaborations)

ICC U2 UST Decommissioning Exam || Most Recent Exam Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ | Guranteed Success!! | Newest Exam | Just

Document preview thumbnail
Preview 4 out of 116 pages

ICC U2 UST Decommissioning Exam || Most Recent Exam Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ | Guranteed Success!! | Newest Exam | Just Released!! ICC U2 UST Decommissioning Exam || Most Recent Exam Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ | Guranteed Success!! | Newest Exam | Just Released!! ICC U2 UST Decommissioning Exam || Most Recent Exam Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ | Guranteed Success!! | Newest Exam | Just Released!! ICC U2 UST Decommissioning Exam || Most Recent Exam Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ | Guranteed Success!! | Newest Exam | Just Released!!

Content preview

ICC U2 UST Decommissioning Exam || Most Recent Exam 2026
-2027 Actual Complete Real Exam Questions And Correct
Answers (Verified Answers) Already Graded A+ |
Guranteed Success!! | Newest Exam | Just
Released!!




Which agency approves a site-specific variance which allows
for an alternative
method of construction or
monitoring:


a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency - ANSWER -a.) The Regional Water Quality
Board


CCR Title 23, Sec 2681(a)


A permit to operate a UST system must have all of the
following listed on the
permit,
EXCEPT:


a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity

,c.) Permit expiration date
d.) Monitoring requirements - ANSWER -b.) Name of the tank
manufacturer and tank capacity


CCR Title 23, Sec 2712(c)


All underground pressurized product piping shall have an
automatic line leak
detector capable of detecting a 3-gallon per hour leak
rate installed
by______________.


a.) July 1,
2003
b.) November 9,
2004
c.) July 1,
2004
d.) July 1, 1987 - ANSWER -b.) November
9, 2004


CCR Title 23, Sec 2636(f)(3)


A temporary closure is appropriate for which of the following:


a.) The UST system is empty and will be removed from service
indefinitely
b.) The UST system has ceased to store hazardous materials
but will be used within the next 12 consecutive months

,c.) The UST system is unable to meet compliance requirements
and will be removed
d.) The UST system has been red-tagged - ANSWER -b.) The
UST system has ceased to store hazardous materials but will
be used within the next 12 consecutive months


CCR Title 23, Sec 2671 & 2670


A local agency determines that a UST facility within the last
year had compliance issues. Prior to issuing a new permit or
renewal to operate an UST the local agency shall:


a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to
Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine compliance - ANSWER -d.)
Inspect the facility and determine compliance


CCR Title 23, Sec 2712(c)


Spill containers must be tested no less than _______________
to demonstrate
that it is capable of containing the hazardous substances until
it is detected and
cleaned
up.


a.) Every 6 months

, b.) Every 36 months
c.) Every 12 months
d.) At the time of install or replacement - ANSWER -c.) Every 12
months


H&SC, Sec 25284.2


All the following components require third party certification,
except:


a.) Automatic tank gauging
systems
b.) Statistical inventory
reconciliation methods
c.) Spill
Containment lids
d.) Liquid phase out-of-tank products - ANSWER -c.) Spill
Containment lids


The exterior surface of an underground storage tank must
bear a marking or
label which shows the following
information, except:


a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturer - ANSWER -c.) Width of the
interstitial space

Document information

Uploaded on
March 10, 2026
Number of pages
116
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$31.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nyagajoseph539
3.8
(56)
Sold
269
Followers
15
Items
11519
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions