OSHA Exam Questions and
Answers 100% PASS
Steel rods and pipes on which forms are lifted must meet all these requirements EXCEPT:—
ANSWER--They must be physically attached to the forms
Who may design and plan lift-slab operations?—ANSWER--A professional engineer
Who must determine when forms and shores may be removed?—ANSWER--The employer
Limited access zones around masonry wall construction must meet all these requirements
EXCEPT:—ANSWER--Limited access zones are designed to keep employees from entering an
area of a wall that is not properly guarded or braced to prevent injuries.
Storage bins and silos must be equipped with ______ bottoms.—ANSWER--Conical
Jacking equipment being used to raise a 2-ton steel column must be capable of supporting at
least _____ tons.—ANSWER--5 tons
Concrete pumping systems using discharge pipes should be provided with pipe supports
designed for ___ percent overload—ANSWER--100 percent
What PPE is required for workers applying cement, sand, and water mixture through a
pneumatic hose?—ANSWER--head and face gear
, When embedded in concrete which one of these materials strengthens it?—ANSWER--
Reinforcing Steel
Erected shoring equipment must be inspected in all the following circumstances EXCEPT:—
ANSWER--During concrete placement
The employer of the members of a designated rescue team are not required to ensure that
the team members have received all training required for authorized entrants.—ANSWER--
False
A confined space entry permit is an authorized approval in ____ form.—ANSWER--Written
What is the meaning of LEL?—ANSWER--Lower Explosive Limit
Each authorized entrant shall use a chest or full body harness, with a retrieval line attached
at the center of the entrant's back, near shoulder level. above the entrant's head, or at
another point from which the employer can establish the ability to successfully remove the
entrant.—ANSWER--True
____ deficiency occurs from chemical or biological reactions which displace or consume
oxygen from within a confined space.—ANSWER--Oxygen
A controlling contractor is that employer with overall responsibility for construction at the
worksite.—ANSWER--True
An ___ employer is an employer whose employees actually enter a permit space.—
ANSWER--Entry
© 2026 Copyright. All Rights Reserved. This document is
protected by copyright law, Copyrighted By Brittie Donald
Answers 100% PASS
Steel rods and pipes on which forms are lifted must meet all these requirements EXCEPT:—
ANSWER--They must be physically attached to the forms
Who may design and plan lift-slab operations?—ANSWER--A professional engineer
Who must determine when forms and shores may be removed?—ANSWER--The employer
Limited access zones around masonry wall construction must meet all these requirements
EXCEPT:—ANSWER--Limited access zones are designed to keep employees from entering an
area of a wall that is not properly guarded or braced to prevent injuries.
Storage bins and silos must be equipped with ______ bottoms.—ANSWER--Conical
Jacking equipment being used to raise a 2-ton steel column must be capable of supporting at
least _____ tons.—ANSWER--5 tons
Concrete pumping systems using discharge pipes should be provided with pipe supports
designed for ___ percent overload—ANSWER--100 percent
What PPE is required for workers applying cement, sand, and water mixture through a
pneumatic hose?—ANSWER--head and face gear
, When embedded in concrete which one of these materials strengthens it?—ANSWER--
Reinforcing Steel
Erected shoring equipment must be inspected in all the following circumstances EXCEPT:—
ANSWER--During concrete placement
The employer of the members of a designated rescue team are not required to ensure that
the team members have received all training required for authorized entrants.—ANSWER--
False
A confined space entry permit is an authorized approval in ____ form.—ANSWER--Written
What is the meaning of LEL?—ANSWER--Lower Explosive Limit
Each authorized entrant shall use a chest or full body harness, with a retrieval line attached
at the center of the entrant's back, near shoulder level. above the entrant's head, or at
another point from which the employer can establish the ability to successfully remove the
entrant.—ANSWER--True
____ deficiency occurs from chemical or biological reactions which displace or consume
oxygen from within a confined space.—ANSWER--Oxygen
A controlling contractor is that employer with overall responsibility for construction at the
worksite.—ANSWER--True
An ___ employer is an employer whose employees actually enter a permit space.—
ANSWER--Entry