Building Construction Estimating Ans: The determination of probable construction costs of any given project. Design-Build Delivery (DB) Ans: In this delivery system, the contractor acts as both the designer and the general contractor. Construction Manager Delivery (CM) Ans: In this delivery system, the contractor and some of the key subcontractors are involved in the design process, providing expertise in construction methods and costs, as well as managing the construction process. Integrated Project Delivery (IPD) Ans: In this delivery system, a relatively new delivery system, involving the owners, designers, contractor and some of the key subcontractors in the design process. Owners, Designers, Contractor and Key Subcontractors all share governance, risk, contingency, and the profit on the project.

Content preview

Page |1


CM 3111 Exam 1 Questions and Correct
Answers/ Latest Update / Already Graded
Building Construction Estimating

Ans: The determination of probable construction costs of any
given project.


Design-Build Delivery (DB)

Ans: In this delivery system, the contractor acts as both the
designer and the general contractor.


Construction Manager Delivery (CM)

Ans: In this delivery system, the contractor and some of the
key subcontractors are involved in the design process, providing
expertise in construction methods and costs, as well as
managing the construction process.


Integrated Project Delivery (IPD)

Ans: In this delivery system, a relatively new delivery system,
involving the owners, designers, contractor and some of the key
subcontractors in the design process. Owners, Designers,
Contractor and Key Subcontractors all share governance, risk,
contingency, and the profit on the project.

All rights reserved © 2025/ 2026 |

, Page |2



Conceptual Estimate

Ans: An estimate prepared by a contractor based on the
project's early plan. Usually drawings are limited or not
available for this type of estimate. The contractor makes
assumptions about virtually every aspect of the project. This
estimate is used early in the design process to check if the
owner can actually afford the project.


Preliminary Estimate

Ans: An estimate that is prepared and maintained by the
contractor during the design process based on the current, but
incomplete design.


Detailed Estimate

Ans: An estimate that includes determination of quantities and
costs of everything that is required to complete the project.
(labor, materials, equipment, insurance, bonds, overhead, and
an estimate of the profit) The contractor must have a complete
set of contract documents for this type of estimate.


Assembly Estimating


All rights reserved © 2025/ 2026 |

, Page |3


Ans: In this type of estimating the estimator bids the
components in groups. This type of estimate can be prepared in
hours instead of days, but this estimate has many broad
assumptions and is less accurate.


Square-Foot Estimates

Ans: Estimates that are prepared by multiplying the square
footage of a building by a cost per square foot a nd then
adjusting the price to compensate for differences in the
building heights, length of the building perimeter, and other
building components. This type of estimate is helpful to check
whether the project, as designed, is within the owner's budget.


Design Drawings

Ans: A single-line floor plan and key elevations.


Parametric Estimates

Ans: These estimates use equations that express the statistical
relationship between building parameters and the cost of the
building. The equations used in these estimates are very
complex and may use log functions, ratios of parameter, and
multiplication of parameters.



All rights reserved © 2025/ 2026 |

, Page |4

Model Estimating

Ans: This type of estimating uses computer models to prepare
an estimate based on a number of questions answered by the
estimator. The model makes many assumptions about the
design of the project that it is working on and avoids the site
and excavation cost.


Project Comparison Estimates

Ans: These estimates are prepared by comparing the cost of a
proposed project to a completed project. The estimator starts
with the costs of a comparable project and then makes
adjustments for differences in the project.


Estimator

Ans: Often involved solely with the estimating of quantities of
materials and the pricing of the project.


Design-Bid-Build (DBB)

Ans: For these kinds of projects, the General Contractor makes
detailed estimates that are used to determine what the
company will charge to do the work.




All rights reserved © 2025/ 2026 |

Document information

Uploaded on
March 9, 2026
Number of pages
36
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Exampromax
5.0
(1)
Sold
5
Followers
0
Items
1135
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions