• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

WASHINGTON State Journeyman Electrician License Exam Study Guide - NEC Actual Questions & Answers | LATEST UPDATED 2025/2026 | Pass Licensing Exam First Attempt

Document preview thumbnail
Preview 2 out of 13 pages

WASHINGTON State Journeyman Electrician License Exam Study Guide - NEC Actual Questions & Answers | LATEST UPDATED 2025/2026 | Pass Licensing Exam First Attempt

Content preview

Who can grant a variance for electrical work? - ANSWER the department or city that has
inspection jurisdiction



Residential buildings wired in Canada, then moved into Washington, must be inspected to
ensure compliance with minimum safety requirements. Which is not one of these safety re-
quirements: - ANSWER the dedicated bathroom receptacle circuit must be installed per
current WAC code



Lawfully installed existing electrical installations that do not comply with the provisions of
this chapter and remain in compliance, with the code at the time of the installation, will be: -
ANSWER permitted to be continued without change (i.e. without circuitry or occupancy
change)



Listed tamper-resistant receptacles are required at __________in designated building occu-
pancies. - ANSWER all locations required by NEC 406. 12; psychiatric patient care facilities
where accessible to patients; psychiatric patient care facilities where accessible to children
five years of age and under



A ______ is a specified laboratory label, symbol, or other identifying mark that indicates the
manufacturer produced the product in compliance with appropriate standards or that the
product has been tested for specific and uses. - ANSWER Certification mark



Low voltage means NEC, Class 1 power limited circuits at volts maximum, Class 2 and Class 3
per NEC 725. 121A, and telecommunications circuits per 19.28 RCW. - ANSWER 30



For the purposes of RCW 19.28.261, setting a manufactured, mobile, or modular building is
work on a________. - ANSWER new building



1

, "Supervision" for the purpose of supervising specialty electrical trainees means that an ap-
propriately certified electrician is on the same job site as the trainee being supervised and
where the job site is outdoors, within _____ of the trainee when within sight of each other. -
ANSWER 1000 feet



A breaker panel that has been accidentally submerged in water must be ____. - ANSWER
replaced or reconditioned by the original manufacturer or by its approved representative



A disconnecting means must be marked by ____. - ANSWER identification plate or panel-
board schedule



Where a recreational vehicle is supplied power from other than 125 volt, single phase, 15- or
20-ampere receptacles, the requirements of GFCI for the outside receptacle______. - AN-
SWER shall not apply to RV supply power receptacles



In a garage or unfinished basement, a red receptacle, with a red cover plate, supplying a fire
alarm system is not required to have GFCI protection. The receptacle must be identified for
use by ____. - ANSWER and identification plate or engraved cover with letters at least 1/4
inch high



A receptacle in a wall countertop space shall be permitted to serve as the receptacle for a
peninsular countertop space where the spaces are contiguous, and the receptacle is located
within ___ feet of the outside edge of the peninsular countertop. - ANSWER 8 feet



Other than plan review projects, the installer must provide a one-line diagram showing the
service and feeder details for the project before the initial inspection can be approved for all
non-dwelling services or feeders that are larger than: - ANSWER 400 amperes or 600
volts




2

Document information

Uploaded on
March 8, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
THESTUDYVAULT
3.4
(20)
Sold
155
Followers
6
Items
14237
Last sold
4 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions