Regulations require that you report any conditions indicating a suspected release to the DEQ within _____.
Correct Answer
24hrs
Question 2
When is an owner/operator no longer required to maintain financial responsibility for a UST?
Correct Answer
When the UST has been properly closed.
Question 3
Class A and Class B operators must be trained within ___ days after assuming operation and maintenance duties at the UST
facility.
Correct Answer
30
Page 1 of 27
,Question 4
Class C operators must be trained before assuming responsibility for responding to emergencies at the UST facility.
Correct Answer
true
Question 5
Which of the following is a Stage I vapor recovery requirement for a facility with a monthly throughput of less than 10,000
gallons?
Correct Answer
All of these examples
Question 6
Owners/operators must maintain accurate and current records for every UST ______.
Correct Answer
not at the ust, not at alt site
Question 7
You must investigate and confirm all suspected releases within ___ days of discovery.
Correct Answer
7
Page 2 of 27
, Question 8
In a pressurized pump system, where is the pump located?
Correct Answer
In the tank
Question 9
You can use groundwater monitoring only if the product stored in the tank __________.
Correct Answer
Does not mix easily with water and instead floats on the water's surface
Question 10
What does spill protection equipment do?
Correct Answer
not none of these
Question 11
How often should owners/operators provide their SIR vendor with inventory, delivery, and dispensing data?
Correct Answer
Every 30 days
Page 3 of 27
Question 1
Regulations require that you report any conditions indicating a suspected release to the DEQ within _____.
Correct Answer
24hrs
Question 2
When is an owner/operator no longer required to maintain financial responsibility for a UST?
Correct Answer
When the UST has been properly closed.
Question 3
Class A and Class B operators must be trained within ___ days after assuming operation and maintenance duties at the UST
facility.
Correct Answer
30
Page 1 of 27
,Question 4
Class C operators must be trained before assuming responsibility for responding to emergencies at the UST facility.
Correct Answer
true
Question 5
Which of the following is a Stage I vapor recovery requirement for a facility with a monthly throughput of less than 10,000
gallons?
Correct Answer
All of these examples
Question 6
Owners/operators must maintain accurate and current records for every UST ______.
Correct Answer
not at the ust, not at alt site
Question 7
You must investigate and confirm all suspected releases within ___ days of discovery.
Correct Answer
7
Page 2 of 27
, Question 8
In a pressurized pump system, where is the pump located?
Correct Answer
In the tank
Question 9
You can use groundwater monitoring only if the product stored in the tank __________.
Correct Answer
Does not mix easily with water and instead floats on the water's surface
Question 10
What does spill protection equipment do?
Correct Answer
not none of these
Question 11
How often should owners/operators provide their SIR vendor with inventory, delivery, and dispensing data?
Correct Answer
Every 30 days