• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

BICSI TE 350 - PROJECT MANAGEMENT EXAM WITH ACCURATE DETAILED SOLUTIONS

Document preview thumbnail
Preview 2 out of 5 pages

BICSI TE 350 - PROJECT MANAGEMENT EXAM WITH ACCURATE DETAILED SOLUTIONS

Content preview

BICSI TE 350 - PROJECT MANAGEMENT EXAM WITH || || || || || || || ||




ACCURATE DETAILED SOLUTIONS || ||




Contract - ✔✔A written document that states the legal obligations of the customer and the
|| || || || || || || || || || || || || || ||




contractor



Material List - ✔✔Contains all of the installation items by description, catalog number,
|| || || || || || || || || || || || ||




quantity, unit price, and total price. || || || || ||




Scope of Work (SOW) - ✔✔Covers the requirements for the ICT systems team and list all the
|| || || || || || || || || || || || || || || || ||




elements of the installation || || ||




Project Log - ✔✔A place to record detailed notes on any issue that arise
|| || || || || || || || || || || || ||




Submittals - ✔✔A form of communication between the contractor and owner defining the
|| || || || || || || || || || || || ||




specifics of how a job will be undertaken
|| || || || || || ||




A Drawings - ✔✔Architectural drawings indicate all physical aspects of the building.
|| || || || || || || || || || ||




Includes - Wall types, elevation, rated construction (Fire and Smoke), reflected ceiling plans,
|| || || || || || || || || || || || ||




door hardware, exact floor penetrations dimensions, cabinetry, and furnishings.
|| || || || || || || ||




M Drawings - ✔✔Mechanical drawings indicate the size and route of HVAC system ducts, air
|| || || || || || || || || || || || || || ||




handler units, chilled water piping, and refrigerant piping within structures.
|| || || || || || || || ||




E Drawings - ✔✔Electrical drawings indicate where the electrical services are installed inside
|| || || || || || || || || || || || ||




the building and the pathways that may be installed by the electrical contractor for the
|| || || || || || || || || || || || || || ||




cabling installation team. || || ||

, Includes - Grounding system, supporting structures, floor boxes, cable tray, surface raceway,
|| || || || || || || || || || || ||




poke-thru, duct banks. || ||




P Drawings - ✔✔Plumbing drawings indicate the size and route of portable water, specialized
|| || || || || || || || || || || || || ||




water, sanitary sewer, and rainwater roof drain piping within structures.
|| || || || || || || || ||




FP Drawings - ✔✔Fire Protection drawings indicate the size and route of the fire suppression
|| || || || || || || || || || || || || || ||




system piping and associated fire suppression agent heads and nozzles within structures.
|| || || || || || || || || || ||




T Drawings - ✔✔Telecommunication, security, and audio-visual drawings indicate the
|| || || || || || || || || ||




telecom work area outlet location, pathways, distribution room, TR Space layouts, and media
|| || || || || || || || || || || || ||




required for the project. || || ||




S Drawings - ✔✔Structural drawing indicate the location of all components of the building
|| || || || || || || || || || || || || ||




structure itself. ||




Includes - Steele beams, concrete floors, exterior walls, and other components that make up
|| || || || || || || || || || || || || ||




the basic structure.
|| ||




Service Drawings - ✔✔Which integrate M, E, P, and T drawings to mitigate the risk of
|| || || || || || || || || || || || || || || ||




collision or obstruction by different systems.
|| || || || ||




T0 Drawings - ✔✔Campus or Site plans - Exterior pathways and intrabuilding systems.
|| || || || || || || || || || || ||




T1 Drawings - ✔✔Layout of complete building per floor - serving zone boundaries, backbone
|| || || || || || || || || || || || || ||




distribution systems, and horizontal pathways. || || || ||

Document information

Uploaded on
March 6, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ruiz
3.2
(15)
Sold
105
Followers
3
Items
14198
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions