Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

ONTARIO OIT COMPREHENSIVE STUDY GUIDE 2026 FULL QUESTIONS AND SOLUTIONS GRADED A+

Document preview thumbnail
Preview 2 out of 7 pages

ONTARIO OIT COMPREHENSIVE STUDY GUIDE 2026 FULL QUESTIONS AND SOLUTIONS GRADED A+

Content preview

ONTARIO OIT COMPREHENSIVE STUDY GUIDE 2026 FULL
QUESTIONS AND SOLUTIONS GRADED A+


● e. 99. Answer: C

● d. Certifying reports in SMARTS. Answer: a. Day to day implementation, inspections, and
observations

● d. Unsafe monitoring event. Answer: a. Qualifying rain event

● c. sediment control. Answer: b. run on/ run off control

● c. RUSLE 2 method. Answer: c. RUSLE 2 method

● d. Discharges of storm water from areas on tribal lands.. Answer: c. Clearing and
grading 2 acres of land

● d. 2 weeks. Answer: c. 10 days

● e. Causes or threatens to cause pollution, contamination, or nuisance. Answer: e.
Causes or threatens to cause pollution, contamination, or nuisance

● d. Stormwater treatment facility. Answer: b. Use of landscaping as a storm drain
treatment feature

● d. Less than 5. Answer: d. Less than 5

● d. ATS Sites only. Answer: d. ATS Sites only

● d. ASAP, but not more than 72 hours. Answer: d. ASAP, but not more than 72 hours

● e. Notice of Intent (NOI). Answer: d. Notice of Termination (NOT)

● b. the risk sediment discharges pose to the receiving waters.. Answer: a. the relative
amount of sediment that can be discharged, driven largely by scheduling and site
characteristics

● c. Sampling for pH, turbidity, and suspended sediments. Answer: b. Sampling for pH
and turbidity

, ● d. 14. Answer: d. 14

● d. Sediment Yield. Answer: d. Sediment Yield

● d. ASAP but not more than 72 hours. Answer: c. 48 hours

● e. Final landscaping and Site Stabilization Phase. Answer: c. Stormwater Sampling

● d. Potential pollutants on site. Answer: a. Project location, length of construction period,
and time of year

● d. Until the end of the construction project. Answer: b. for a minimum of 3 Years

● d. Wind Erosion. Answer: c. Sheet Erosion

● LUP projects are subject to post-construction requirements due to the nature of their
construction to return project sites to preconstruction conditions.. Answer: False

● A project may be terminated if construction activities have been suspended.. Answer:
True

● A project may not be terminated if the permitted construction property is
sold(property ownership has been transferred) prior to project completion. Answer:
False

● All Annual Reports, or other information required by the General Permit (other than
PRDs and NOTs) or requested by the Regional Water Board, State Water Board, U.S.
EPA, or local stormwater management agency shall be certified and submitted by the
QSD. Answer: False (LRP Certifies)

● At Risk Level 2 & 3 sites, receiving water monitoring is required if the receiving water
monitoring trigger exceeded pH, turbidity and SSC. Bioassessment for sites 30 acres
or larger.. Answer: False (Risk level 3 only)

● Discharges located within the watershed of an impaired water body, for which a
TMDL for sediment has been adopted by the Regional Water Board or USEPA, must
comply with the approved TMDL if it identifies "construction activity" or land
disturbance as a source of sediment.. Answer: True

● For purposes of "Final Stabilization", the site will not pose any additional sediment
discharge risk than it did prior to the commencement of construction activity.. Answer:
True

Document information

Uploaded on
March 5, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
32
Followers
1
Items
14355
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions