Single-wall UST Systems containing the following shall be upgraded to double-wall UST
Systems except for:
a.) Tanks containing liquids with a pH>13
b.) Waste oil tanks
c.) Solvent tanks
d.) Motor vehicle fuel tanks - ANSWER d.) Motor vehicle fuel tanks
CCR Title 23, Sec 2662(b)
What is interstitial monitoring used for:
a) To detect under-dispenser containment leaks.
b.) To detect the presence of liquid between the primary and secondary containment.
c.) To monitor tank volume.
d.) To control fuel flow to the dispenser. - ANSWER b.) To detect the presence of liquid
between the primary and secondary containment.
CCR Title 23, Sec 2611
'Interstitial space' & 2632(b)
Underground storage tank that is installed after December 22, 1998 means
b. An underground storage tank that was installed after 1987
c. An underground storage tank that is not an existing underground storage
d. An underground storage tank that was installed after July 1, 2003 - ANSWER c. An
underground storage tank that is not an existing underground storage
CCR Title 23, Sec 2611
,The Federal law governing underground storage tank is know as:
a. The Underground Storage of Hazardous Substances Control Act
b. The Clean Water Act
c. The Safe Drinking Water Act
d. The Resource Conservation and Recovery Act, Subtitle I - ANSWER d. The Resource
Conservation and Recovery Act, Subtitle I
Which section of US Code is the Federal Act coded in?
a. The Underground Storage of Hazardous Substances Control Act
b. The Clean Water Act
c. The Safe Drinking Water Act
d. Subchapter IX of chapter 82 of Title 42 of the United States Code, as added by the
Hazardous and Solid Waste Amendments of 1984, or as it may subsequently be
amended or supplemented. - ANSWER d. Subchapter IX of chapter 82 of Title 42 of the
United States Code, as added by the Hazardous and Solid Waste Amendments of 1984,
or as it may subsequently be amended or supplemented.
H≻ 25281
California law requires that underground storage tanks be inspected every
a. Three years by the local agency.
b. Year by the designated operator
c. Year by the local agency
d. Two years by the local agency - ANSWER c. Year by the local agency
H≻ 25288
,Secondary containment was required for hazardous substance and petroleum
underground storage tanks installed after
a. December 22, 1998
b. July 1, 1991 for underground storage tanks and January 1, 1992 for piping
c. January 1, 1984
d. January 1, 2002 - ANSWER c. January 1, 1984
H≻ 25291 (a)
Secondary containment was required for all pressurized, petroleum underground piping
installed after
a. December 22, 1998
b. July 1, 2003
c. January 1, 1984
d. July 1, 1987 - ANSWER d. July 1, 1987
H≻ 25291 (a)(7)(E)
All of the following shall be marked on the exterior surface of an underground storage
tank, EXCEPT?
a. Maximum operating temperature in degrees Fahrenheit
b. Nominal Capacity in gallons
c. Useable capacity in gallons
d. City and State of manufacture - ANSWER d. City and State of manufacture
, CCR; i2631 i(b)
What iis ithe iminimum ithickness iof ia isteel iof ia istriker iplate?
a. 1/8 iinch
b. 2 iinches ilager ithan ithe iopening iit ilies ibeneath
c. ¼ iinch
d. ½ iinch i- iANSWER ia. i1/8 iinch
CCR; i2631 i(c)
All iof ithe ifollowing iis irequired ito ibe iincluded iin ian iUST iwritten imonitoring iprocedure,
iEXCEPT:
a. The imethods iand iequipment, iidentified iby iname iand imodel
b. The inames iand ititles iof ithe ipersons iresponsible ifor imonitoring ithe iequipment.
c. The iname iof ithe iemergency icoordinator
d. A idescription iof ithe itraining irequired ifor ithe ioperation iof ithe itank isystem. i - iANSWER
c. iThe iname iof ithe iemergency icoordinator
CCR; i 2632
All iof ithe ifollowing iare iexempt ifrom iregulation ias ian iUST, iEXCEPT:
a. A i 1000 i gallon i UST i on i a i farm
b. Drums iin ibasements ithat icontain i55 igallons ior iless
c. Liquid iasphalt itank
d. A ibulk ifield iconstructed iUST i- iANSWER id. iA ibulk ifield iconstructed iUST
100% Correct Latest Update
Single-wall UST Systems containing the following shall be upgraded to double-wall UST
Systems except for:
a.) Tanks containing liquids with a pH>13
b.) Waste oil tanks
c.) Solvent tanks
d.) Motor vehicle fuel tanks - ANSWER d.) Motor vehicle fuel tanks
CCR Title 23, Sec 2662(b)
What is interstitial monitoring used for:
a) To detect under-dispenser containment leaks.
b.) To detect the presence of liquid between the primary and secondary containment.
c.) To monitor tank volume.
d.) To control fuel flow to the dispenser. - ANSWER b.) To detect the presence of liquid
between the primary and secondary containment.
CCR Title 23, Sec 2611
'Interstitial space' & 2632(b)
Underground storage tank that is installed after December 22, 1998 means
b. An underground storage tank that was installed after 1987
c. An underground storage tank that is not an existing underground storage
d. An underground storage tank that was installed after July 1, 2003 - ANSWER c. An
underground storage tank that is not an existing underground storage
CCR Title 23, Sec 2611
,The Federal law governing underground storage tank is know as:
a. The Underground Storage of Hazardous Substances Control Act
b. The Clean Water Act
c. The Safe Drinking Water Act
d. The Resource Conservation and Recovery Act, Subtitle I - ANSWER d. The Resource
Conservation and Recovery Act, Subtitle I
Which section of US Code is the Federal Act coded in?
a. The Underground Storage of Hazardous Substances Control Act
b. The Clean Water Act
c. The Safe Drinking Water Act
d. Subchapter IX of chapter 82 of Title 42 of the United States Code, as added by the
Hazardous and Solid Waste Amendments of 1984, or as it may subsequently be
amended or supplemented. - ANSWER d. Subchapter IX of chapter 82 of Title 42 of the
United States Code, as added by the Hazardous and Solid Waste Amendments of 1984,
or as it may subsequently be amended or supplemented.
H≻ 25281
California law requires that underground storage tanks be inspected every
a. Three years by the local agency.
b. Year by the designated operator
c. Year by the local agency
d. Two years by the local agency - ANSWER c. Year by the local agency
H≻ 25288
,Secondary containment was required for hazardous substance and petroleum
underground storage tanks installed after
a. December 22, 1998
b. July 1, 1991 for underground storage tanks and January 1, 1992 for piping
c. January 1, 1984
d. January 1, 2002 - ANSWER c. January 1, 1984
H≻ 25291 (a)
Secondary containment was required for all pressurized, petroleum underground piping
installed after
a. December 22, 1998
b. July 1, 2003
c. January 1, 1984
d. July 1, 1987 - ANSWER d. July 1, 1987
H≻ 25291 (a)(7)(E)
All of the following shall be marked on the exterior surface of an underground storage
tank, EXCEPT?
a. Maximum operating temperature in degrees Fahrenheit
b. Nominal Capacity in gallons
c. Useable capacity in gallons
d. City and State of manufacture - ANSWER d. City and State of manufacture
, CCR; i2631 i(b)
What iis ithe iminimum ithickness iof ia isteel iof ia istriker iplate?
a. 1/8 iinch
b. 2 iinches ilager ithan ithe iopening iit ilies ibeneath
c. ¼ iinch
d. ½ iinch i- iANSWER ia. i1/8 iinch
CCR; i2631 i(c)
All iof ithe ifollowing iis irequired ito ibe iincluded iin ian iUST iwritten imonitoring iprocedure,
iEXCEPT:
a. The imethods iand iequipment, iidentified iby iname iand imodel
b. The inames iand ititles iof ithe ipersons iresponsible ifor imonitoring ithe iequipment.
c. The iname iof ithe iemergency icoordinator
d. A idescription iof ithe itraining irequired ifor ithe ioperation iof ithe itank isystem. i - iANSWER
c. iThe iname iof ithe iemergency icoordinator
CCR; i 2632
All iof ithe ifollowing iare iexempt ifrom iregulation ias ian iUST, iEXCEPT:
a. A i 1000 i gallon i UST i on i a i farm
b. Drums iin ibasements ithat icontain i55 igallons ior iless
c. Liquid iasphalt itank
d. A ibulk ifield iconstructed iUST i- iANSWER id. iA ibulk ifield iconstructed iUST