STORAGE TANK FINAL EXAM 2026
WITH QUESTIONS AND CORRECT
ANSWERS | ALREADY GRADED A+ |
GUARANTEED A+ | CLASS A/B FOR
UNDERGROUND STORAGE TANK
EXAM 2026 LATEST VERSION!!
To permanently close a tank, an owner and operator shall: - ANSWER- Remove
the tank from the ground, Fill with an inert solid if removal jeopardizes the
building structure integrity, and Empty and clean the tank by removing all liquids
and accumulated sludge and purge it of all vapors
If you have 100 or fewer tanks, financial responsibility is required in the aggregate
the amount of: - ANSWER- $1 Million
Petroleum marketers are required to have finanical responsibility to cover X dollars
per occurence. X is.... - ANSWER- $1 Million
, Can an owner use pollution liability insurance as a means of financial
responsibility? - ANSWER- Yes
UST systems with impressed current cathodic protection systems must also be
inspected at a minimum of: - ANSWER- Every 60 days
Product inventory control shall be conducted monthly to detect a release of not less
than X% of flow through plus 130 gallons a monthly basis. X% is: - ANSWER-
1%
Automatic line leak detector may be used only if the method detects X gallons per
hour at 10 pounds per square inch line pressure within one hour. X is: - ANSWER-
3 gallons per hour
Tank tightness testing, or another test of equivalent performance, shall be capable
of detecting X gallon per hour leak rate from any portion of the tank while
accounting for the effects of thermal expansion or the contraction of the product,
vapor pockets, tank deformation, evaporation or condensation, and the location of
the water table. X is: - ANSWER- 0.1 gallons per hour
MUSTR requires that X soil borings to be taken as close as practical to the bottom
of the UST, but no more than 5 feet away from the tank, nor more than 2 feet
below the tank. X is: - ANSWER- 2 soil borings
The results of site assessments conductedper MUSTR R 29.2155 are required to be
kept by the owner for not less than X years. X is: - ANSWER- 3 years
Which National Leak Prevention Association Standard on lining of USTs is
adopted by reference in the MUSTR? - ANSWER- 631