OBJECTIVE ASSESSMENT ACTUAL
EXAM 2025/2026 QUESTIONS WITH
CORRECT ANSWERS GRADED
A+//<BEST SOLUTIONS>
1. A firm begins its strategic business initiative of developing a new business model that
will allow the firm to deliver an efficient, tailored service to its customers. To accomplish
this, the firm initiates a business management project. Which aspect of project
management applies to this firm's project? - ANSWER Interdependent Tasks
2. A firm begins its strategic business initiative of developing a new business model to
enhance its competitiveness. What can be identified as a strategic business initiative for
this firm? - ANSWER Improvement in product design
3. A firm begins a strategic business initiative of developing a new business model that will
allow the firm to deliver an efficient, tailored service to its customers. - ANSWER Project
sponsor
4. Which group is included in the five process groups? - ANSWER Closing process group
5. What does PRINCE2 stand for? - ANSWER PRojects IN a Controlled Environment
6. Which PMBOK process group is described as the delivery part of project management
where the main activity happens? - ANSWER Executing
,7. Which advantage does the functional (departmentalized) organizational structure provide
for a firm with multiple projects? - ANSWER Lines of authority are clear.
8. Which two organizations are examples of organizations with the functional organizational
structure? - ANSWER (1) The U.S. Department of State and (2) The U.S Department of
Energy
9. An organization expects to use a project management office (PMO) to support multiple
projects that will be implemented within a projectized organizational structure. Which
implied effect is a benefit to this organization? - ANSWER Project team members gain
access to historical data from other projects.
10. Regardless of the organizational structure used to manage a project, an organization
elects to use a project management office (PMO). Which benefit will this organization
gain? - ANSWER Projects will coordinate resource usage by monitoring the status of
shared resources.
11. During a certain project phase, specific blueprints are drawn and approved, materials and
labor costs are estimated, prototypes are created, and work activities and tasks are
identified. Also, quality expectations, measurements, and costs are defined. During which
project phase do these activities occur? - ANSWER Planning
12. Place the project activities in order of occurrence from first (1) to last (5). - ANSWER (1)
Collecting customer requirements (2) Developing the work breakdown structure (3)
Working to produce project deliverables (4) Customers evaluating the project outcomes
(5) Capturing lessons learned
13. During which life cycle phase is the vast majority of the actual work to produce the
project's deliverables completed? - ANSWER Executing
14. What is the correct term for an intermediate outcome of project work, such as a signed
contract or obtaining a construction permit? - ANSWER Deliverable
,15. Which deliverable from a work breakdown structure (WBS) is not specific enough to
measure its completion at project closure? - ANSWER User training
16. The following table shows the Level 1 work breakdown structure (WBS) for Project A.
17. WBS ID Description
18. Project A
19. Project started
20. 2.0 Feasiblity
21. 3.0 Design
22. 4.0 Development
23. 5.0 Manufacturing
24. 6.0 Distribution
25. 7.0 Project completed
26. Which approach did the project manager use to structure the WBS? - ANSWER
Sequence of project phases
27. For the following collapsed work breakdown structure (WBS) for Project O, the project
manager must complete the scope baseline. In addition to the WBS, the scope baseline
will contain two additional documents.
28. WBS ID Description
29. Project O
30. Project started
31. 2.0 Feasibility
32. 3.0 Design
33. 4.0 Development
34. 5.0 Manufacturing
35. 6.0 Distribution
36. 7.0 Project completed
37. What are the other two documents that belong in the scope baseline? - ANSWER WBS
dictionary and project scope statement
38. For the following collapsed work breakdown structure (WBS) for Project O, the project's
steering committee held a phase gate review of the Feasibility results. That review
, determined that the project's proposed design would be obsolete before it would reach the
marketplace.
39. WBS ID Description
40. Project O
41. Project started
42. 2.0 Feasibility
43. 3.0 Design
44. 4.0 Development
45. 5.0 Manufacturing
46. 6.0 Distribution
47. 7.0 Project completed
48. Which action should the project manager initiate? - ANSWER Terminating the project as
soon as possible and releasing the project's resources
49. A project is an operational necessity to repair a design flaw in the date field that
constrains the year number to two digits, instead of permitting the year to be indicated
with four digits. If the project is not completed before December 31, 1999, many legacy
programs are expected to fail or produce unpredictable outcomes. The marketing
department wants to upgrade its existing computer equipment and have the costs included
in the budget for this project. The project team implemented the marketing department's
request without completing the formal change control procedures.
50. What has happened to the scope baseline in this scenario? - ANSWER Scope creep has
caused a scope variance.
51. A general contractor is managing a highway construction project that will repair a flood-
damaged road. The project was documented in a cost-plus-incentive fee contract that
specified a completion date of June 30. The Department of Transportation has offered an
incentive for early completion of the repairs.
52. Which triple-constraint baseline remains unchanged by the effects of the incentive? -
ANSWER Scope