• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

WGU C720 Complete OA Prep Guide with over 150 examinable points answered

Document preview thumbnail
Preview 4 out of 35 pages

WGU C720 Complete OA Prep Guide with over 150 examinable points answered. focusing on managing processes to create products and services. It covers supply chain design, quality control, inventory management, logistics, forecasting, and lean systems, aiming to help students understand end-to-end operational efficiency,

Content preview

WGU C720 Complete OA Prep
Guide with over 150
examinable points answered

Effective capacity

The maximum capacity given the product mix, equipment changeovers, and
scheduled downtime of the production schedule. Always less than design
capacity.




Actual Output

Total amount produced during a given time period.




Capacity Utilization

A metric, or measure, used to determine how much capacity is actually being
used on an average basis.



Capacity utilization = Actual Output / Design Capacity




Efficiency Rate

A metric, or measure, used to determine how much effective capacity is
actually being used to achieve output.



Efficiency = Actual Output / Effective Capacity

,Theory of Constraints (TOC)

5-step thinking process which helps a firm achieve optimal throughput in the
current system, by identifying the bottleneck and coordinating the system
around the bottleneck's capacity. Also helps identify ways of overcoming the
bottleneck.




Throughput

The maximum rate of output possible




The Theory of Constraints 5-step thinking process

1. Identify the system's constraint(s): Determine the bottleneck of
improvement opportunity



2. Exploit the system's constraint: Ensure the bottleneck is at 100% capacity
utilization or throughput.



3. Subordinate everything else to the above decision: Communicate the
bottleneck



4. Elevate the system's constraint: Determine how to increase the
bottleneck's capacity



5. If a constraint has been broken, go back to step 1. Do not allow inertia to
cause a system's constraint.

,As indicated in the 5th step of the thinking process, TOC is about continuous
improvement. Once one bottleneck has been identified and overcome,
another constraint will become a bottleneck to the system.




Facility location

The placement of a facility with regard to a company's customers, suppliers,
and other facilities with which the company interacts based on quantitative
and qualitative factors.



Quantitative factors are easily measurable and are usually assigned a
numerical value, while qualitative factors are more subjective and are usually
not enumerated.




Regional facility strategy

Requires that each production facility has a defined marketing area and each
facility produces a complete line of products for that area. This is often done
when customer convenience and access are important, or when outbound
transportation costs are very high.




Product facility strategy

Means that one facility is responsible for producing one product or product
line and shipping that product throughout the country and the world. This
approach is appropriate when the production process is complex and hard to
control, such as making ceramic heat shields for spacecraft.




Total Cost Formula

TC = VC(x) + FC

, o VC = variable cost

o x = number of units

o FC = fixed costs.



Total Cost = variable cost * number of units plus fixed costs.




Variable costs

Are those which change and can be adjusted as business conditions change




Assembly Line

Process selection most appropriate to produce high volume with little to no
variation.



Uses product facility layout (i.e. car manufacture)




Continuous Flow

Process selection most appropriate to produce high volume with no variation.



Uses product facility layout (i.e. oil refinery). Also called continuous inventory
flow




Batch Flow

Connected book
 image
Publisher: 2011 ISBN: 9780071289948 Edition: Unknown

Document information

Uploaded on
March 3, 2026
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NURSCLARE
4.1
(15)
Sold
34
Followers
14
Items
762
Last sold
5 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions