100% satisfaction guarantee Immediately available after payment Read online or as PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Construction Management Final Questions With Complete Solutions

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
02-03-2026
Written in
2025/2026

Construction Management Final Questions With Complete Solutions

Institution
Construction Management
Course
Construction Management

Content preview

Construction Management Final Questions With Complete Solutions



The following are the challenges facing the construction industry today, except - (ANSWER)decreasing
demand in sustainability requirements



the parameters define the overall extent of work to be included in a construction contract. -
(ANSWER)scope of project



a supplemental drawing to the plans and specifications that details fabrication method, materials, and
models of a product or installation associated with the project. - (ANSWER)shop drawings



it is a process of awarding a contract to subcontractors and issuing a purchase order for materials and
equipment. - (ANSWER)buy out



a request made by the owner to add or subtract features to the scope of the project resulting in changes
to the contract - (ANSWER)change order



a daily amount of money paid by the contractor to the owner for each day that the project fails to meet
the completion date specified in the contract - (ANSWER)liquidated damage



a change or addition to the contract documents issued after the documents have been released but
before the bids are due - (ANSWER)addenda



a contract document set consists of - (ANSWER)an agreement, construction drawings, specifications,
addenda, general and supplementary condition



the shop drawings are prepared by the - (ANSWER)architect



in the traditional project delivery method for buildings, the day-to-day supervision of the construction is
generally the responsibility of the - (ANSWER)general contractor



what is the first known recorded building code that outlines the roles and duties of the master builder -
(ANSWER)code of hammurabi

, Construction Management Final Questions With Complete Solutions



in the construction management (CM) method of project delivery, there is normally no general
contractor - (ANSWER)true



in the construction management at risk (CMAR) method of project delivery, the construction manager -
(ANSWER)manages the project's construction during the construction phase



what project delivery method in which only one firm is contracted for both design and construction of
the project - (ANSWER)design-build



what delivery method is best used if highly technical in nature of the project that requires good
communication and coordination need to occur between designers and builder? - (ANSWER)Design-
build



what delivery method in which there is no or limited input from contractors and subcontractors during
the design phase? - (ANSWER)Design-Bid-Build



Turnkey method is a variation of what delivery method when it also involves arranging for land and
financing of the project? - (ANSWER)Design-Build



what delivery method in which it is hard to get real up-front fixed price, or price may not be known until
it is actually built? - (ANSWER)design-build



what delivery method in which the owner assumes full responsibility on all liability risk during
construction stage? - (ANSWER)CM



the Master Format has been developed by the: - (ANSWER)Construction Specifications Institute



The UNIFORMAT II has been developed by the: - (ANSWER)American Society for Testing and Materials



the current master format consists of how many divisions - (ANSWER)50

Written for

Institution
Construction Management
Course
Construction Management

Document information

Uploaded on
March 2, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Read online or as PDF
No strings attached

Get to know the seller
Seller avatar
DoryPlus

Get to know the seller

Seller avatar
DoryPlus Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
1319
Member since
2 months
Number of followers
0
Documents
602
Last sold
3 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions