Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and
optionally
preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.
size=2 face=Arial>
A. i,ii,iii are true and iv is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,iii,iv are true and i is false - Correct Answers -A
A Test Plan Outline contains which of the following:-
i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
A. I,ii,iii are true and iv is false
B. i,iii,iv are true and ii is false
C. ii,iii are true and i and iv are false
D. i,ii are false and iii , iv are true - Correct Answers -B
One of the fields on a form contains a text box which accepts numeric values in the
range of
18 to 25. Identify the invalid Equivalance class
A. 17
B. 19
C. 24
D. 21 - Correct Answers -A
In a Examination a candidate has to score minimum of 24 marks inorder to clear the
exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance
values if the student clears the exam.
A. 22,23,26
B. 21,39,40
C. 29,30,31
,D. 0,15,22 - Correct Answers -C
Which of the following statements regarding static testing is false:
A. Static testing requires the running of tests through the code
B. Static testing includes desk checking
C. Static testing includes techniques such as reviews and inspections
D. Static testing can give measurements such as cyclomatic complexity - Correct
Answers -A
Verification involves which of the following:
i. Helps to check the Quality of the built product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
A. Options i,ii,iii,iv are true.
B. i is true and ii,iii,iv are false
C. i,ii,iii are true and iv is false
D. ii is true and i,iii,iv are false. - Correct Answers -B
Component Testing is also called as :-
i. Unit Testing
ii. Program Testing
iii. Module Testing
iv. System Component Testing .
A. i,ii,iii are true and iv is false
B. i,ii,iii,iv are false
C. i,ii,iv are true and iii is false
D. all of above is true - Correct Answers -A
Link Testing is also called as :
A. Component Integration testing
B. Component System Testing
C. Component Sub System Testing
D. Maintenance testing - Correct Answers -A
Methodologies adopted while performing Maintenance Testing:-
A. Breadth Test and Depth Test
B. Re-testing
C. Confirmation Testing
D. Sanity Testing - Correct Answers -A
, Which of the following is true about Formal Review or Inspection:-
i. Led by Trained Moderator (not the author).
ii. No Pre Meeting Preparations
iii. Formal Follow up process.
iv. Main Objective is to find defects
A. ii is true and i,iii,iv are false
B. i,iii,iv are true and ii is false
C. i,iii,iv are false and ii is true
D. iii is true and I,ii,iv are false - Correct Answers -B
The Phases of formal review process is mentioned below arrange them in the correct
order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual Preparations
v. Kick Off
vi. Follow Up
A. i,ii,iii,iv,v,vi
B. vi,i,ii,iii,iv,v
C. i,v,iv,ii,iii,vi
D. i,ii,iii,v,iv,vi - Correct Answers -C
Consider the following state transition diagram of a two-speed hair dryer, which is
operated by pressing its one button. The first press of the button turns it on to Speed 1,
second press to Speed 2 and the third press turns it off.
Which of the following series of state transitions below will provide 0-switch coverage?
A. A,C,B
B. B,C,A
C. A,B,C
D. C,B,A - Correct Answers -C
White Box Techniques are also called as:
A. Structural Testing
B. Design Based Testin
C. Error Guessing Technique
D. Experience Based Technique - Correct Answers -A
ANSWERS
Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and
optionally
preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria.
size=2 face=Arial>
A. i,ii,iii are true and iv is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,iii,iv are true and i is false - Correct Answers -A
A Test Plan Outline contains which of the following:-
i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
A. I,ii,iii are true and iv is false
B. i,iii,iv are true and ii is false
C. ii,iii are true and i and iv are false
D. i,ii are false and iii , iv are true - Correct Answers -B
One of the fields on a form contains a text box which accepts numeric values in the
range of
18 to 25. Identify the invalid Equivalance class
A. 17
B. 19
C. 24
D. 21 - Correct Answers -A
In a Examination a candidate has to score minimum of 24 marks inorder to clear the
exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance
values if the student clears the exam.
A. 22,23,26
B. 21,39,40
C. 29,30,31
,D. 0,15,22 - Correct Answers -C
Which of the following statements regarding static testing is false:
A. Static testing requires the running of tests through the code
B. Static testing includes desk checking
C. Static testing includes techniques such as reviews and inspections
D. Static testing can give measurements such as cyclomatic complexity - Correct
Answers -A
Verification involves which of the following:
i. Helps to check the Quality of the built product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
A. Options i,ii,iii,iv are true.
B. i is true and ii,iii,iv are false
C. i,ii,iii are true and iv is false
D. ii is true and i,iii,iv are false. - Correct Answers -B
Component Testing is also called as :-
i. Unit Testing
ii. Program Testing
iii. Module Testing
iv. System Component Testing .
A. i,ii,iii are true and iv is false
B. i,ii,iii,iv are false
C. i,ii,iv are true and iii is false
D. all of above is true - Correct Answers -A
Link Testing is also called as :
A. Component Integration testing
B. Component System Testing
C. Component Sub System Testing
D. Maintenance testing - Correct Answers -A
Methodologies adopted while performing Maintenance Testing:-
A. Breadth Test and Depth Test
B. Re-testing
C. Confirmation Testing
D. Sanity Testing - Correct Answers -A
, Which of the following is true about Formal Review or Inspection:-
i. Led by Trained Moderator (not the author).
ii. No Pre Meeting Preparations
iii. Formal Follow up process.
iv. Main Objective is to find defects
A. ii is true and i,iii,iv are false
B. i,iii,iv are true and ii is false
C. i,iii,iv are false and ii is true
D. iii is true and I,ii,iv are false - Correct Answers -B
The Phases of formal review process is mentioned below arrange them in the correct
order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual Preparations
v. Kick Off
vi. Follow Up
A. i,ii,iii,iv,v,vi
B. vi,i,ii,iii,iv,v
C. i,v,iv,ii,iii,vi
D. i,ii,iii,v,iv,vi - Correct Answers -C
Consider the following state transition diagram of a two-speed hair dryer, which is
operated by pressing its one button. The first press of the button turns it on to Speed 1,
second press to Speed 2 and the third press turns it off.
Which of the following series of state transitions below will provide 0-switch coverage?
A. A,C,B
B. B,C,A
C. A,B,C
D. C,B,A - Correct Answers -C
White Box Techniques are also called as:
A. Structural Testing
B. Design Based Testin
C. Error Guessing Technique
D. Experience Based Technique - Correct Answers -A