Which of the following is not phase of the Fundamental Test Process? A. Test Planning
and Control
B. Test implementation and Execution
C. Requirement Analysis
D. Evaluating Exit criteria and reporting - Correct Answers -C. Requirement Analysis
Independent Verification & Validation is
A. Done by the Developer
B. Done by the Test Engineers
C. Done By Management
D. Done by an Entity Outside the Project's sphere of influence - Correct Answers -D.
Done by an Entity Outside the Project's sphere of influence
Functional system testing is:
A. testing that the system functions with other systems
B. testing that the components that comprise the system function together
C. testing the end to end functionality of the system as a whole
D. testing the system performs functions within specified response times - Correct
Answers -C. testing the end to end functionality of the system as a whole
Validation involves which of the following
i. Helps to check the Quality of the Built Product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
A. Options i, ii, iii, iv are true
B. ii is true and i iii iv are false
C. iii iii are true and iv is false
D. iii is true and iii iv are false. - Correct Answers -B. ii is true and i iii iv are false
Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible - Correct Answers -C. Is impractical and impossible
ANSWERS
Which of the following is not phase of the Fundamental Test Process? A. Test Planning
and Control
B. Test implementation and Execution
C. Requirement Analysis
D. Evaluating Exit criteria and reporting - Correct Answers -C. Requirement Analysis
Independent Verification & Validation is
A. Done by the Developer
B. Done by the Test Engineers
C. Done By Management
D. Done by an Entity Outside the Project's sphere of influence - Correct Answers -D.
Done by an Entity Outside the Project's sphere of influence
Functional system testing is:
A. testing that the system functions with other systems
B. testing that the components that comprise the system function together
C. testing the end to end functionality of the system as a whole
D. testing the system performs functions within specified response times - Correct
Answers -C. testing the end to end functionality of the system as a whole
Validation involves which of the following
i. Helps to check the Quality of the Built Product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
A. Options i, ii, iii, iv are true
B. ii is true and i iii iv are false
C. iii iii are true and iv is false
D. iii is true and iii iv are false. - Correct Answers -B. ii is true and i iii iv are false
Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible - Correct Answers -C. Is impractical and impossible