• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 43 pages
Exam (elaborations)

Nccco Core Prep Test Alternate Questions And Correct Answers

Document preview thumbnail
Preview 4 out of 43 pages

NCCCO CORE PREP TEST ALTERNATE QUESTIONS AND CORRECT ANSWERS

Content preview

OSHA refers to the area which it is reasonably foreseeable that partially or
completely suspended materials could fall as the


Give this one a try later!


Fall zone




What should be planned for in regards to getting a large crane to a job site?


Give this one a try later!


Constricting roads




What must be known prior to setting up your crane?

,Give this one a try later!


Location of underground vaults




When constructing crane mats, the best way to secure the timbers together is to:


Give this one a try later!


Bolt them together




The effective weight of an attachment is:


Give this one a try later!


Any of these options




Who is responsible for calculating net capacity?


Give this one a try later!


Crane Operator




Crane stability is based on:


Give this one a try later!

, The leverage principle




According to Table A of OSHA 1926.1408 the minimum clearance distance for a power
line at 100 KV is?


Give this one a try later!


15 ft.




How often should the crane operator inspect standard running wire rope?


Give this one a try later!


Every shift (When in use)




Where should the crane's outrigger pads or tracks be placed when working at ground
floor level near a cellar wall?


Give this one a try later!


At least as far back as the depth of the wall below ground




What is a cantilever section on a lattice boom crane?


Give this one a try later!

, The outermost section past the pendant line connection point




What may happen to a properly rigged load when lifted off the ground unless the
operator takes account of boom deflection?


Give this one a try later!


It could swing out away from the crane




Who is responsible for ensuring the crane owner is notified of any damage to the
crane or replacement/repair of wire rope?


Give this one a try later!


Crane User




While setting a crane up on unstable ground what must the operator ensure?


Give this one a try later!


The stabilizer is 90° to the pad




When using a luffing jib, decreasing the angle will _______?


Give this one a try later!

Document information

Uploaded on
February 28, 2026
Number of pages
43
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
12
Followers
0
Items
4767
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions