• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Swppp Exam 670 Practice Review 2026 Tested Questions

Document preview thumbnail
Preview 2 out of 10 pages

SWPPP EXAM 670 PRACTICE REVIEW 2026 TESTED QUESTIONS

Content preview

SWPPP EXAM 670 PRACTICE REVIEW 2026
TESTED QUESTIONS


◉ Co-located practices Answer: During construction, a facility
functions for ESC, and is later constructed into a stormwater BMP.


◉ During construction, when should inspector make sure a BMP is
not installed? Answer: BMP should not be installed before
contirbuting drainage area has been stabilized.


◉ Notice of Termination forms, to terminate construction permits,
must be sent after how many days once conditions are met? Answer:
30 days


◉ When is ground considered stabilized? Answer: when vegetation
is uniform, mature enough to survive, and will inhibit erosion.


◉ How long must VSMP authority keep construction record
drawings? Answer: Until the relevant SWM facility is removed.


◉ How soon after meeting permit requirements must the VSMP
authority return any bonds or securities to operator? Answer:
within 60 days.

, ◉ VSMP authorities must ensure that SWM facilities, post-
construction, are inspected at least once every ___ years, unless:
Answer: at least once every 5 years unless a certified personnel
provides inspection reports at least once a year.


◉ What legislation authorizes the VA SWM Program? Answer: The
Virginia Stormwater Management Act


◉ What regulation administers the VA SWM Program? Answer: The
Virginia Stormwater Management Program Regulation


◉ The Stormwater Management act requires the State Water Control
Board to do what? Answer: permit, regulate, and control stormwater
runoff


◉ How many days does DEQ have to complete review of real or
potential inter-jurisdicitonal impacts upon request? Answer: 90
days


◉ Who is required to maintain a certificate of competency by the
Stormwater Management Act? Answer: staff of a stormwater
program, anyone contracted by a VSMP authority, and all standard
and specification holders

Document information

Uploaded on
February 26, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(16)
Sold
195
Followers
5
Items
60840
Last sold
2 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions