• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Swppp Exam 670 Final Script 2026 Complete Solution Set

Document preview thumbnail
Preview 2 out of 10 pages

SWPPP EXAM 670 FINAL SCRIPT 2026 COMPLETE SOLUTION SET

Content preview

SWPPP EXAM 670 FINAL SCRIPT 2026
COMPLETE SOLUTION SET

◉ At what % impervious cover are streams substantially affected?
Answer: 25%


◉ what is the site-based load limit for water quality? Answer: 0.41
lbs/acre/yr total phosphorous


◉ Virginia Runoff Reduction Method- method of load calculations
Answer: load calculations based on land cover type and soil type.


◉ what must happen to potentially harmful sheet flow runoff?
Answer: Must be diverted to stormwater conveyance system.


◉ SWM ponds must be able to convey water safely up to what level
storm event? Answer: must be able to safely convey up to a 100 yr
storm.


◉ Define LDA Answer: Land disturbing activity; any man-made
change to the land surface that potentially changes its runoff
characteristics; includes clearing, grading, and excavation.

, ◉ What size LDA must comply with stormwater management
regulation? in CPBA areas? Answer: anything of 1 acre or more, or
2500 ft^2 in CPBA areas; may be more stringent locally.


◉ what are some activities exempt from SWM regulations? Answer:
mining, agriculture, sewer discharges, local reclamation programs,
routine maintenance of preexisting operations, public emergency
activity


◉ what term basically means a plea deal for stormwater offenders?
Answer: consent order, which replaces penalties with fines.


◉ how long does VSMP authority have to review SWM plan?
Answer: 15 days to review and determine approval, and notify
applicant.


◉ How often must a VSMP authority inspect an LDA? Answer:
Periodically.


◉ all SWPPP requirements may be met by Answer: incorporating
other plans into reference, or by developing missing elements.


◉ What must the DEQ issue to an operator before an LDA? Answer:
a construction GP

Document information

Uploaded on
February 26, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(16)
Sold
195
Followers
5
Items
60840
Last sold
2 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions