CHAPTER M 1: COMMERCIAL
M M BUILDING M PLANS M AND M SPECIFICATIONS
TABLE OF CONTENTS
M M
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where
m m m m m m m m m m m m
appropriate, with answers that are complete sentences.
m m m m m m m
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
m m m m m m m m m m m m
applicable, responses should be written in complete sentences.
m m m m m m m m
1. What section of a commercial building’s specification contains a list of
m m m m m m m m m m
contract documents?
m m
Answer: A list of the contract documents is contained in General Clauses and
m m m m m m m m m m m m
Conditions. A listing of the Commercial Building contract documents is
m m m m m m m m m m
mpresented in this chapter under the heading ―Commercial Building Plans.‖ The
m m m m m m m m m m
instructor may wish to have the students check over this listing and compare it
m m m m m m m m m m m m m m
mwith the plans provided.
m m m
2. The requirement for temporary light and power at the job site will be found in what
m m m m m m m m m m m m m m m
portion of a commercial building’s specification?
m m m m m
Answer: The Supplementary General Conditions specifies the job site requirements
m m m m m m m m m
for temporary light and power. In some contracts, this electrical system becomes the
m m m m m m m m m m m m m
responsibility of the general contractor; in other contracts, it is the electrical
m m m m m m m m m m m m
contractor’s responsibility to install and maintain the temporary electrical system. The
m m m m m m m m m m m
instructor may wish to refer the student to NEC Article 590 and discuss the
m m m m m m m m m m m m m m
requirements in detail.
m m m
1 | Pag m m m m
me
,3. The electrician uses the Schedule of Working Drawings for what purpose?
m m m m m m m m m m
Answer: The electrician uses the Schedule of Working Drawings to determine
m m m m m m m m m m
mwhether all of the drawings are at hand. The information on ―the other sheets‖ may
m m m m m m m m m m m m m m
be very important, especially in coordinating with other contractors.
m m m m m m m m m
4. Complete the following items by indicating the letter(s) designating the
m m m m m m m m m
correct source(s) of information:
m m m m
No. Answer Item Information
4. Sections Ceiling height m Sections, Sheet A6 m m
5. Electrical Electrical receptacle m Electrical symbol schedule, Chapter 2,
m m m m
msymbol style
m mFigure 2–6 m
mschedul
e
6. Electrical Electrical Electrical layout drawings, Sheets m m m
mlayout outlet location
m m El, E2, and E3
m m m m
mdrawing
s
7. Elevations m Exterior wall finishes m m Elevations, Sheets A4 and A5 m m m m
8. Site plan m Grading elevations m Site plan, Sheet A4
m m m
9. Electrical Panelboard schedules m Electrical layout drawings, Sheet E4 m m m m
mlayout
mdrawing
s
10. Architectural Room width m Architectural floor plan, Sheets Al, m m m m
floor plan
m m A2, and A3
m m m
11. Architectural Swing of door m m Architectural floor plan, Sheets Al, A2, m m m m m
floor plan
m m and A3 m
12. Sections View of interior wall
m m m Sections, Sheet A6 m m
Match the items on the left with those on the right by writing the letter designation of
m m m m m m m m m m m m m m m m
the appropriate organization from the list on the right.
m m m m m m m m m
13. NEC Electrical Code m National Electrical Code (NEC) m m m