NICET LEVEL III WATER BASED LAYOUT EXAM QUESTIONS AND CORRECT ANSWERS | 100% VERIFIED | LATEST UPDATE 2026/2027 | GRADED A+.

Document preview thumbnail
Preview 3 out of 24 pages

NICET LEVEL III WATER BASED LAYOUT EXAM QUESTIONS AND CORRECT ANSWERS | 100% VERIFIED | LATEST UPDATE 2026/2027 | GRADED A+. General Conditions - CORRECT ANSWER - What is not included in the technical specification? •contract •specifications •contract drawings - CORRECT ANSWER - Bid documents include? General Conditions - CORRECT ANSWER - Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect. Supplementary Conditions - CORRECT ANSWER - Addendums, time schedules, working days allowed, delay agreements, payment schedules Construction Specifications Institute (CSI) - CORRECT ANSWER - Specifications typically use what format? Contractors - CORRECT ANSWER - Construction manager concept is when the owner contracts with the construction manager who oversees ____________ working on the project Design-Build Concept - CORRECT ANSWER - Sometimes referred to as a turn-key type agreement or contract? general contractor - CORRECT ANSWER - Multiple Prime Contractor Method has the intent is eliminate the middleman __________ __________. •architectural/structural contractor •mechanical contractor •electrical contractor - CORRECT ANSWER - Multiple prime contractor method involve more than one prime contractor which consist of? General category and supplementary conditions - CORRECT ANSWER - Contract conditions is divided into two categories which is? Addendum - CORRECT ANSWER - Changes to the contract or other modifications. •up-front payments •progress payments •lump sum - CORRECT ANSWER - Types of payment schedules are? Bidding requirements, sample forms, conditions of the contract and specifications, including general conditions and supplementary conditions - CORRECT ANSWER - What comprises the project manual? •contract itself •contract conditions •specifications •drawings - CORRECT ANSWER - Contract documents include: Preliminary, bid, approval, construction, as-built - CORRECT ANSWER - Drawings have different stages which are? Request for proposal (RFP) - CORRECT ANSWER - Oftentimes a project will begin with a _________. •certified value specialist •owner's representatives •designers and consultants •the construction team •cost estimator •building management staff •third-party (independent) reviewers - CORRECT ANSWER - Valueengineering team typically consist of? •Information gathering •brainstorming •analysis •development •recommendations - CORRECT ANSWER - Value-engineering typically goes through phases which are? Planning stage - CORRECT ANSWER - At what stage does value-engineering provide the most benefit?

Content preview

NICET LEVEL III WATER BASED LAYOUT EXAM
QUESTIONS AND CORRECT ANSWERS | 100%
VERIFIED | LATEST UPDATE 2026/2027 | GRADED A+.



General Conditions - CORRECT ANSWER - What is not included in the
technical specification?


•contract
•specifications
•contract drawings - CORRECT ANSWER - Bid documents include?


General Conditions - CORRECT ANSWER - Codes, standards, Authority
Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing,
insurance and bond requirements, ect.


Supplementary Conditions - CORRECT ANSWER - Addendums, time
schedules, working days allowed, delay agreements, payment schedules


Construction Specifications Institute (CSI) - CORRECT ANSWER -
Specifications typically use what format?


Contractors - CORRECT ANSWER - Construction manager concept is when
the owner contracts with the construction manager who oversees ____________
working on the project


Design-Build Concept - CORRECT ANSWER - Sometimes referred to as a
turn-key type agreement or contract?

,general contractor - CORRECT ANSWER - Multiple Prime Contractor
Method has the intent is eliminate the middleman __________ __________.


•architectural/structural contractor
•mechanical contractor
•electrical contractor - CORRECT ANSWER - Multiple prime contractor
method involve more than one prime contractor which consist of?


General category and supplementary conditions - CORRECT ANSWER -
Contract conditions is divided into two categories which is?


Addendum - CORRECT ANSWER - Changes to the contract or other
modifications.


•up-front payments
•progress payments
•lump sum - CORRECT ANSWER - Types of payment schedules are?


Bidding requirements, sample forms, conditions of the contract and
specifications, including general conditions and supplementary conditions -
CORRECT ANSWER - What comprises the project manual?


•contract itself
•contract conditions
•specifications
•drawings - CORRECT ANSWER - Contract documents include:


Preliminary, bid, approval, construction, as-built - CORRECT ANSWER -
Drawings have different stages which are?

, Request for proposal (RFP) - CORRECT ANSWER - Oftentimes a project will
begin with a _________.


•certified value specialist
•owner's representatives
•designers and consultants
•the construction team
•cost estimator
•building management staff
•third-party (independent) reviewers - CORRECT ANSWER -
Valueengineering team typically consist of?


•Information gathering
•brainstorming
•analysis
•development
•recommendations - CORRECT ANSWER - Value-engineering typically goes
through phases which are?


Planning stage - CORRECT ANSWER - At what stage does value-engineering
provide the most benefit?


•federal government
•general services administration (GSA)
•large companies - CORRECT ANSWER - Who commonly uses the multiple
prime contractor method?


Owner, architect, general contractor, subcontractor - CORRECT ANSWER -
Traditional method contract uses the typical chain of command which is?

Document information

Uploaded on
February 21, 2026
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcelAcademia2026
3.7
(384)
Sold
2280
Followers
1650
Items
9061
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions