ICC Vapor Recovery 1 Pt. 2 Exam comprehensive
questions | FREQUENTLY MOST TESTED
QUESTIONS AND VERIFIED SOLUTIONS/GET IT
100% ACCURATE!! 2026!!
Save
Terms in this set (54)
Under Dispenser Containment is c. standards of an independent testing
required to be designed and organization with industry code
constructed in accordance with ____.
a. the appropriate Executive Order
b. generally accepted secondary
containment practices
c. standards of an independent
testing organization with industry
code
d. an engineering specification
approved by a state registered
professional engineer or engineering
standard
,With a Gilbarco Vapor-Vac, the OPW b. 75%
12VW nozzle has a hole or tear in the
vapor escape guard, it is a defect if
____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline thread sealant can be used a. threaded portion of rotatable adapters
on all except _____.
a. threaded portion of rotatable
adapters
b. p/v valve
c. ball float
d. riser adapter
when installing copper tubing use all d. copper stretching tool
except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a torque b. 20-50 lbs
range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
, When installing the hanging d. oil or grease
hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO VR-101-E d. all the above
you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above
There are four ball valves on the c. top valve open, the rest are closed
clean air separator, what position are
they to be in?
a. top and bottom valve open, the
rest are closed
b. top and bottom valve closed, the
rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are
closed
The drop tube used in EO #VR-101-E b. Phil-Tite 61SO-PT
is the
a. OPW 61SO-PT
b. Phil-Tite 61SO-PT
c. EBW 61SO-PT
d. VST 61SO-PT
questions | FREQUENTLY MOST TESTED
QUESTIONS AND VERIFIED SOLUTIONS/GET IT
100% ACCURATE!! 2026!!
Save
Terms in this set (54)
Under Dispenser Containment is c. standards of an independent testing
required to be designed and organization with industry code
constructed in accordance with ____.
a. the appropriate Executive Order
b. generally accepted secondary
containment practices
c. standards of an independent
testing organization with industry
code
d. an engineering specification
approved by a state registered
professional engineer or engineering
standard
,With a Gilbarco Vapor-Vac, the OPW b. 75%
12VW nozzle has a hole or tear in the
vapor escape guard, it is a defect if
____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65%
Gasoline thread sealant can be used a. threaded portion of rotatable adapters
on all except _____.
a. threaded portion of rotatable
adapters
b. p/v valve
c. ball float
d. riser adapter
when installing copper tubing use all d. copper stretching tool
except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool
The Husky P/V valve has a torque b. 20-50 lbs
range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs
, When installing the hanging d. oil or grease
hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease
When installing in the EO VR-101-E d. all the above
you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above
There are four ball valves on the c. top valve open, the rest are closed
clean air separator, what position are
they to be in?
a. top and bottom valve open, the
rest are closed
b. top and bottom valve closed, the
rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are
closed
The drop tube used in EO #VR-101-E b. Phil-Tite 61SO-PT
is the
a. OPW 61SO-PT
b. Phil-Tite 61SO-PT
c. EBW 61SO-PT
d. VST 61SO-PT