CPIM PRACTICE EXAM 1+2 QUESTIONS
AND ANSWERS GRADED A+ 2025/2026




Mixed-model scheduling is most appropriately used to accomplish which of the following?



A. Build inventory in advance of peak demand.

B. Increase daily production efficiency.

C. Produce the products expected to be sold that day.

D. Reduce cumulative lead time - ANS C. Produce the products expected to be sold that day.



Which of the following manufacturing processes would most likely be characterized by a narrow
range of standard products, low direct labor costs, and a high level of technical support for
manufacturing?



A. Job shop

B. Line

C. Batch

D. Project - ANS B. Line



The number of exposures to stockouts can best be decreased if which of the following factors is
increased?



1 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

,A. Order quantity of replenishment orders

B. Customer service level percentage

C. Cost of placing purchase orders

D. Cost of stockouts - ANS A. Order quantity of replenishment orders



A company has a lean relationship with a supplier. Which of the following should be shared with
the supplier for procurement planning over the horizon?



A. Purchase order

B. Kanban

C. Contract

D. Schedule - ANS D. Schedule



Which of the following factors has the greatest impact on reducing transportation inventory?



A. Fuel surcharges

B. Transit time

C. Safety stock

D. Shipment size - ANS B. Transit time



A process that is monitored using control charts has been in control but now has a mean that is
trending out of control. What is the most likely reason for this?



A. Tooling that has begun to wear

B. Operator who needs a refresher

C. Different way of measuring


2 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

,D. Machine error - ANS A. Tooling that has begun to wear



When investing in large, high-throughput equipment, the planned tradeoff is typically between
reduced per-unit costs and the potential of:



A. competitive mimicking.

B. underutilized capacity.

C. increasing per-unit costs.

D. capacity technology obsolescence. - ANS B. underutilized capacity.



Which of the following factors must be known in order to compute economic order quantity
(EOQ)?



A. Forecast variation

B. Safety stock

C. Setup cost

D. Lead time - ANS C. Setup cost



Which of the following would typically be considered a strategic use of the conclusions from a
SWOT analysis?



A. Developing promotional material to emphasize the strengths

B. Sharing the four lists with all employees

C. Using the threats as a tool to motivate employees

D. Using strengths to limit the impact of external threats - ANS D. Using strengths to limit the
impact of external threats



3 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

, Can master scheduling be done in a make-to-order (MTO) environment? , master scheduling
should take place at which of the following levels?



A. Yes, but it would occur at the raw material level.

B. No, demand orders cannot be issued until actual orders appear.

C. No, only final assembly scheduling is needed.

D. Yes, but only at the product family level. - ANS A. Yes, but it would occur at the raw
material level.



Which of the following validations is most likely to be performed for measuring master
scheduling performance as it relates to sales and operations planning in a make-to-stock
company?



A. The bottleneck work center has a safety capacity to absorb unplanned demand.

B. The inventory plan supports the finished goods portion of the business plan.

C. The master schedule equals the production plan quantity.

D. Available-to-promise shows inventory for promising customer orders. - ANS C. The master
schedule equals the production plan quantity.



When is processor-dominated scheduling most often and most effectively used?



A. Order due dates are inflexible.

B. Material is relatively expensive.

C. Capacity is flexible.

D. Capacity is relatively expensive. - ANS D. Capacity is relatively expensive.




4 @COPYRIGHT 2026 ALLRIGHTS RESERVED.

Document information

Uploaded on
February 17, 2026
Number of pages
66
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars
3.3
(40)
Sold
266
Followers
7
Items
14493
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions