Subsea) Fundamentals Exam Questions AND
CORRECT ANSWERS (VERIFIED ANSWERS) Q&A
2026|INSTANT DOWNLOAD PDF
1. What is the primary objective of well control in drilling
operations?
A. To increase drilling speed
B. To prevent formation damage
C. To prevent uncontrolled flow of formation fluids
D. To reduce drilling costs
Rationale: Well control ensures formation fluids do not enter
the wellbore uncontrollably.
Correct Answer: C
2. Which condition defines a “kick”?
A. Increase in hook load
B. Loss of circulation
C. Unintended entry of formation fluids into the wellbore
D. Decrease in pump pressure
Rationale: A kick occurs when formation pressure exceeds
hydrostatic pressure.
Correct Answer: C
,3. What provides the primary well control barrier during
drilling?
A. Casing
B. BOP
C. Drilling mud hydrostatic pressure
D. Cement
Rationale: Mud weight maintains hydrostatic pressure to
control formation fluids.
Correct Answer: C
4. Which factor mainly determines hydrostatic pressure?
A. Pump speed
B. Hole diameter
C. Mud density and true vertical depth
D. Flow rate
Rationale: Hydrostatic pressure depends on fluid density and
vertical depth.
Correct Answer: C
5. What is the function of a subsea BOP stack?
A. Increase drilling efficiency
B. Shut in the well and control pressure
,C. Mix drilling mud
D. Support drill pipe
Rationale: BOPs are secondary well control equipment.
Correct Answer: B
6. Which BOP component can seal around any size pipe?
A. Pipe ram
B. Blind ram
C. Annular preventer
D. Shear ram
Rationale: Annular preventers can close around various shapes
and sizes.
Correct Answer: C
7. What is the purpose of a blind shear ram?
A. Seal around drill pipe
B. Cut the pipe and seal the well
C. Control annular pressure
D. Reduce mud losses
Rationale: Blind shear rams cut tubulars and close the well.
Correct Answer: B
8. Which indicator most clearly suggests a kick while drilling?
, A. Increase in RPM
B. Increase in pit volume
C. Increase in hook load
D. Decrease in torque
Rationale: Pit gain is a direct sign of influx.
Correct Answer: B
9. What is shut-in drill pipe pressure (SIDPP)?
A. Pressure in the annulus
B. Pressure inside drill pipe after shut-in
C. Pump pressure during circulation
D. Casing test pressure
Rationale: SIDPP indicates formation pressure at the bit.
Correct Answer: B
10. What is shut-in casing pressure (SICP)?
A. Pressure inside drill pipe
B. Pressure in the annulus after shut-in
C. Mud pump pressure
D. Riser pressure
Rationale: SICP reflects annular pressure due to influx.
Correct Answer: B