Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

7B WOOD DESTROYING PESTS FINAL EXAM 2026 ACTUAL QUESTIONS AND ANSWERS SCORED

Document preview thumbnail
Preview 2 out of 13 pages

7B WOOD DESTROYING PESTS FINAL EXAM 2026 ACTUAL QUESTIONS AND ANSWERS SCORED

Content preview

7B WOOD DESTROYING PESTS FINAL EXAM 2026
ACTUAL QUESTIONS AND ANSWERS SCORED A+
✔✔Drill and treat brick or stone veneer only when the brick ledge is: - ✔✔below grade

✔✔the most common method of interior slab treatment is: - ✔✔vertical drilling

✔✔A preferred option to vertical drilling, when no access is available from inside is: -
✔✔short rodding

✔✔Vertically drilled holes should be no more than: - ✔✔12 inches apart and injected
under low pressure

✔✔Long rodding has similar advantages to (blank) for treating under interior slab
construction - ✔✔Short rodding

✔✔What is the most practical method to treat soil in monolithic slab construction? -
✔✔short rodding?

✔✔Most kinds of construction require interior perimeter treating of the foundation, the
exception is: - ✔✔Monolithic slab

✔✔T of F: Wood treatment is most likely required in monolithic slab construction - ✔✔F

✔✔Postconstruction treatment of a crawl space should include treating the foundation
around the piers, support walls, and - ✔✔plumbing lines

✔✔Typical termite entry points for basement construction are the same as for: -
✔✔Floating slabs

✔✔Routine soil retreatments for termite control should be: - ✔✔never

✔✔Soil treatment with most termiticides should not be: - ✔✔in a crawl space used as a
plenum

✔✔Which is true about non-plenum crawl spaces? - ✔✔Air vents should be ducted to
draw in air from outside the structure before treatment

✔✔When treating slabs containing or covering heating ducts, you should reconsider
treating if the ducts - ✔✔have soil of sand bottom, have standing water, are made of
material containing cellulose

, ✔✔What is true concerning application of termiticide under of around subslab heating
ducts? - ✔✔Rodding from outside may be the best treatment procedure

✔✔In treating under and around subslab heating ducts, what should be done after
drilling is completed but before treatment? - ✔✔See if air is coming through the hole

✔✔After treating a structure with sub slab heating ducts, what should be done if a
strong odor persists? - ✔✔clean the ducts out or consult the customer on what's going
on

✔✔Which is true about controlling termites in basements with French drains and sump
parts? - ✔✔it may be best to drill test holes first before proceeding with treatment

✔✔What should be done to correct situations in which wooden member extend through
the concrete in the basement floor? - ✔✔Cut the wooden number a little, pour concrete
into hole after treating and leave the wood rest on concrete

✔✔Before treating a basement on the outside: - ✔✔check foundation walls for cracks

✔✔How should termite infestations be controlled around basement windows and
wooden sills? - ✔✔Rod down under them

✔✔the principles used to control termites in dirt-filled concrete porches also apply to: -
✔✔stoops, sidewalks, and driveways

✔✔Which is not true about termite control operations around dirt-filled concrete porches
on frame houses? - ✔✔Removing dirt and installing termite bait stations provides the
best control

✔✔Which is true about terite control around wells, cisterns, and other water sources? -
✔✔Mechanical alteration and direct wood treatment should be relied on as much as
possible

✔✔If soil treatment is to be made near foundation walls near wells or cistern, a good
general practice is to: - ✔✔remove the soil to the footing, place it in a plastic sheeting
and treat, and replace it

✔✔what is the best treatment method for structures with in-ground foam insulation? -
✔✔trenching

✔✔T or F: Soil treatment to control termites is not always possible in all structures -
✔✔T

Document information

Uploaded on
February 8, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.4
(19)
Sold
157
Followers
7
Items
26054
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions