Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

2025 LEADING SAFE CERTIFICATION EXAM QUESTIONS AND ANSWERS!!

Document preview thumbnail
Preview 4 out of 41 pages

2025 LEADING SAFE CERTIFICATION EXAM QUESTIONS AND ANSWERS!!

Content preview

2025 LEADING SAFE CERTIFICATION EXAM QUESTIONS
AND ANSWERS!!




SAFe stands for? - answer-;Scaled Agile Framework enterprise



HIP stands for? - answer-;Hardening, Innovation, Planning



(Test) What are the 7 states of Kanban? Need to know more of each of the 7 states. - answer-;1. Funnel
(All big ideas welcome)

2. Review (Epic Value Statement & calculate WSJF)

3. Analysis (light weight business case for ROI)

- Go/No Go Decision

5. Portfolio Backlog (Epics approved by PPM)

6. Implementation

7. Done (Epic criteria met)



Difference between funding in SAFe and Non-SAFe environments? - answer-;1. SAFe = Fund Value
Stream

2. Non-SAFe = Fund Project



System Teams support at what Level? - answer-;Team Level



A Product Manager can support? - answer-;2-4 Product Owners

,A Product Owner can support? - answer-;1-2 Teams



(Test) A Tool to get teams to a Commitment? Know more about Stretch Objectives. - answer-;Stretch
Objectives



(Test) WSJF stands for? Know the need for it at each level and who uses it and for what decisions. -
answer-;Weighted Shortest Job First

WSJF = CoD

Job Size

User Business Value + Time Criticality + RR/OE Value

Job Size



Last step in Sprint Planning? - answer-;Commitment



XP Practices include? - answer-;Software:

1. Test First

2. Continuous Integration

3. Pair Work

4. Refactoring

5. Selective Ownership

Hardware:

1. Co-Location

2. Set Based Design

3. Design Verification



2 types of Agile Architecture - answer-;1. Emergent Architecture

2. Intentional Architecture

- Every Team deserves to see the bigger picture, Every team is empowered to design their part.

- A balance between emergent design & intentional architecture is required for speed of development
and maintainability.

,4 things to Facilitate Continuous Integration? - answer-;1. Single Branch Development

2. Frequent Checking

3. Full Stack of User Slices

4. STUB - Development by Intention



2 techniques to avoid physical Branch (Stay on the Mainline)? - answer-;1. Branching by Abstraction

2. Feature Toggles



How do we measure Flow? - answer-;CFD (Cumulative Flow Diagram)



(Test) Retrospective has 2 parts? - answer-;1. Inspect & Adapt

2. Problem Solving Workshop



(Test) PO Sync does what 4 things? - answer-;1. Refines Backlog

2. Resolves Issues

3. Roadmap

4. Vision Updates



(Test) Who does the System Demo? Know more as to when it's done and what is the outcome. - answer-
;System Team



IP stand for what? - answer-;Innovation & Planning



A System Increment should be? - answer-;Produced no more than 1 Sprint in front of Team increment



(Test) 3 parts of Inspect & Adapt Workshop? - answer-;1. PI Predictability Quantitative Measure (80-
100%)

2. System Demo PI

, 3. Problem Solving Workshop (Root Cause Analysis)

- Attendees: Teams & Stakeholders



What Role drives execution at the Value Stream Level? - answer-;VSE (Value Stream Engineer)



Solution Intent contains 3 things

(Test) What drives the upper limit to 125? - answer-;Dunbar's Number: Maintain stable social
relationships



(Test) Why do we want to organize around Value? - answer-;Fewer handoffs, drive alignment, easier to
build in quality, optimize the whole system



Operational Value Stream is? - answer-;Used to deliver end customer value



(Test) Development Value Stream means? - answer-;Development of Systems & Capabilities that enable
the operational value streams



(Test) Where do we start to ID Multiple Value Streams? - answer-;4 Dimensions? Significant
Opportunity, Clear products/solutions, Leadership support, Collaborating Teams.



(Test) 3 things to Motivate? - answer-;1. Autonomy

2. Mastery

3. Purpose



Responsibilities SPCs can take on to drive? Why? - answer-;Communication, Form the team, Teach
leaders & stakeholders, Train the Teams, Launch ARTs, Coach ARTs, Scale wins. Why? Connect the dots
in the enterprise.



(Test) Taking the Leading SAFe training is a? Know other training for different resources. - answer-;Key
thing to get Leadership buy-in.

Document information

Uploaded on
February 7, 2026
Number of pages
41
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTotur2
3.3
(85)
Sold
572
Followers
38
Items
6074
Last sold
1 hour ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions