POWER ENGINEERING 3B2 CHAPTER
15 EXAM QUESTIONS AND ANSWERS.
VERIFIED 2026.
If a plant is going to be shut down for a turnaround who should be notified? - ANS Those
affected by the shut down.
1. supply vendors.
2. Customers.
3. Contractors.
What is the objective of a PM program? - ANS Discover developing problems and prevent
equipment malfunctions/breakdowns.
What two classifications can PM work be separated into? - ANS 1. Mechanical.
2. Paper work.
A maintenance program should have a list of all equipment requiring PMs plus a? - ANS PM
inspection checklist for each piece of equipment.
Once a PM is completed it should be entered into? - ANS PM equipment history file.
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
15 EXAM QUESTIONS AND ANSWERS.
VERIFIED 2026.
If a plant is going to be shut down for a turnaround who should be notified? - ANS Those
affected by the shut down.
1. supply vendors.
2. Customers.
3. Contractors.
What is the objective of a PM program? - ANS Discover developing problems and prevent
equipment malfunctions/breakdowns.
What two classifications can PM work be separated into? - ANS 1. Mechanical.
2. Paper work.
A maintenance program should have a list of all equipment requiring PMs plus a? - ANS PM
inspection checklist for each piece of equipment.
Once a PM is completed it should be entered into? - ANS PM equipment history file.