**Question 1.** Which Florida statute specifically governs the licensure and practice of landscape
architects in the state?
A) Chapter 455, Florida Statutes
B) Chapter 481, Part II, Florida Statutes
C) Chapter 553, Florida Statutes
D) Chapter 601, Florida Statutes
Answer: B
Explanation: Chapter 481, Part II of the Florida Statutes outlines the requirements for licensure,
registration, and regulation of landscape architects in Florida.
**Question 2.** Under Florida Rule Chapter 61G10, what is the primary purpose of the professional seal
on construction documents?
A) To certify that the project meets all local zoning codes
B) To indicate that a licensed professional has prepared or reviewed the documents
C) To guarantee that the contractor will be paid on time
D) To authorize the issuance of building permits
Answer: B
Explanation: The seal confirms that a licensed landscape architect has prepared or reviewed the
documents, ensuring accountability and compliance with professional standards.
**Question 3.** In the context of professional ethics, what does the acronym HSW stand for?
A) Health, Safety, and Welfare
B) Hazardous Substance Warning
C) High‑Speed Workflows
D) Homeowner Satisfaction Warranty
Answer: A
, [20FLLA] 20 FL LA LA FL Landscape Architecture Section
F English Certification Exam Guide
Explanation: HSW refers to Health, Safety, and Welfare, a core ethical responsibility for protecting the
public in design and construction.
**Question 4.** Which phase of the project lifecycle involves creating a detailed programming brief that
defines client goals, site constraints, and performance criteria?
A) Construction Administration
B) Conceptual Design
C) Programming
D) Close‑out
Answer: C
Explanation: Programming is the initial phase where the design team gathers and documents all project
requirements before design development.
**Question 5.** A “lump‑sum” contract in landscape architecture typically:
A) Pays the contractor based on actual hours worked
B) Provides a fixed total price for the entire scope of work
C) Requires payment only after each milestone is completed
D) Allows unlimited changes without additional cost
Answer: B
Explanation: Lump‑sum contracts set a single, predetermined price for the whole project, placing risk of
cost overruns on the contractor.
**Question 6.** Scope creep is best managed by:
A) Ignoring client requests after the contract is signed
B) Including a clear change order process in the contract documents
C) Allowing unlimited revisions during construction
, [20FLLA] 20 FL LA LA FL Landscape Architecture Section
F English Certification Exam Guide
D) Reducing the original design scope without notice
Answer: B
Explanation: A defined change order process provides a formal mechanism to document, evaluate, and
price any additional work, controlling scope creep.
**Question 7.** Which type of insurance is most essential for a landscape architect to carry to protect
against professional negligence claims?
A) General liability insurance
B) Workers’ compensation insurance
C) Professional liability (errors & omissions) insurance
D) Builder’s risk insurance
Answer: C
Explanation: Professional liability insurance covers claims arising from errors, omissions, or negligence in
the provision of professional services.
**Question 8.** The digital seal in Florida must be:
A) Printed on every sheet of a set of documents
B) Embedded in the PDF file’s metadata and visible on each page
C) Used only on electronic submittals, not on hard copies
D) Applied only to the contract agreement page
Answer: B
Explanation: Florida requires the digital seal to be embedded in the PDF’s metadata and displayed on
each page to ensure authenticity of electronic documents.
**Question 9.** In a set of construction documents, the demolition plan is primarily used to:
A) Show final planting locations
, [20FLLA] 20 FL LA LA FL Landscape Architecture Section
F English Certification Exam Guide
B] Detail grading slopes and drainage patterns
C) Identify structures and features to be removed before new work begins
D) List specifications for paving materials
Answer: C
Explanation: The demolition plan outlines which existing structures, utilities, or vegetation must be
removed prior to construction.
**Question 10.** Which CSI MasterFormat division covers site grading and earthwork?
A) Division 02 – Existing Conditions
B) Division 03 – Concrete
C) Division 31 – Earthwork
D) Division 33 – Utilities
Answer: C
Explanation: Division 31 of the CSI MasterFormat is dedicated to earthwork, including grading,
excavation, and compaction.
**Question 11.** A “section” in a construction drawing typically shows:
A) A top‑down view of the entire site
B) A cut‑away view that reveals vertical relationships of elements
C) A schedule of plant species
D) The project’s budget breakdown
Answer: B
Explanation: Sections are vertical cuts through the design that illustrate the relationship and dimensions
of built elements.