1911 (Pg.2)
!!
1. Informative Annex !! !!
provides a list of product safety standards used for product listin !! !! !! !! ** ** ** ** ** **
g where that listing is required by the NEC.
** ** ** ** ** ** ** **
Informative Annex A (NEC 70-710)
** ** ** **
2. Which chapters in the NEC apply generally to all installations?
** ** ** ** ** ** ** ** **
Chapter 1 through 4 apply to all electrical installations (Pg.5)
** ** ** ** ** ** ** ** **
3. Every three years, the National Electrical code is revised, but the Code has only been o
** ** ** ** ** ** ** ** ** ** ** ** ** ** **
n a three-year cycle since
** ** ** ** *** * * * .
1975 (Pg.2)
**
4. The purpose of the National Electrical Code is the practical safeguarding of
** ** ** ** ** ** ** ** ** ** **
form hazards arising from the use of electricity.
** ** ** ** ** ** **
Persons and Property (Pg.2)
** ** **
5. The original Code document was developed in
** ** ** ** ** ** **
as a result of the united efforts o ** ** ** ** ** ** **
f various insurance, electrical, architectural, and allied interests.
** ** ** ** ** ** **
1897 (Pg.2)
**
6. Informative annexes are not part of the requirements of the NEC but are included for
** ** ** ** ** ** ** ** ** ** ** ** ** **
only.
Informational Notes (Pg.5) ** **
7. What city was home to the first central-
** ** ** ** ** ** **
station electric generating plant developed by Thomas A. Edison?
** ** ** ** ** ** ** **
New York City (Pg. 2)
** ** ** **
,8. Chapter *** * consists of tables that are applicable as referenced.
** ** ** ** ** ** **
9 (Pg.5)
**
9. In the NEC, UL is the abbreviation for .
** ** ** ** ** ** ** **
Underwriters Laboratories, Inc. (Pg.7) ** ** **
10. Listed or labeled equipment shall be installed and used in accordance with any
** ** ** ** ** ** ** ** ** ** ** **
included in the listing or labeling. ** ** ** ** **
Instructions (Pg. 6) (NEC 110.3 (B)). ** ** ** ** **
Unit 2 **
1. An **
branch circuit supplies two or more receptacles or outlets for lighting a
** ** ** ** ** ** ** ** ** ** **
nd appliances.
**
General Purpose (Pg. 16)
** ** **
2.
is the largest amount of current capable of being delivered at a point on the electri
** ** ** ** ** ** ** ** ** ** ** ** ** ** **
cal system during a shout-circuit condition.
** ** ** ** **
Available fault current (Pg.20)
** ** **
3. An **
branch circuit consists of two or more ungrounded conductors having a pot
** ** ** ** ** ** ** ** ** ** **
ential difference between them, and a grounded conductor having equal potential diffe
** ** ** ** ** ** ** ** ** ** **
rence between it and each ungrounded conductor of the circuit and that is connected to
** ** ** ** ** ** ** ** ** ** ** ** ** **
the neutral or grounded conductor of the system.
** ** ** ** ** ** ** **
Multiwire (Pg.16) **
4. An intermittent operation in which load conditions are regularly recurrent is the definiti
** ** ** ** ** ** ** ** ** ** ** **
on of . ** **
Periodic Duty (NEC 70-34)
** ** **
5. The ** is the connection between the grounded-
** ** ** ** **
, circuit conductor and the equipment grounding conductor at the service.
** ** ** ** ** ** ** ** **
Main bonding jumper (Pg.14)
** ** **
6. An **
is used to connect the system grounded conductor or the equipment to
** ** ** ** ** ** ** ** ** ** ** *
a grounding electrode or to a point on the grounding electrode system.
* ** ** ** ** ** ** ** ** ** ** **
Grounding electrode conductor (Pg. 22)
** ** ** **
7. Rainproof, raintight, or watertight equipment can fulfill the requirements for
** whe ** ** ** ** ** ** ** ** *** *
re varying weather conditions other than wetness, such as snow, ice, dust, or temper
** ** ** ** ** ** ** ** ** ** ** ** **
ature extremes, are not a factor.
** ** ** ** **
Weatherproof (NEC 70-41) ** **
8. An is an intentionally constructed, low-
** ** ** ** **
impedance electrically conductive path designed and intended to carry current under
** ** ** ** ** ** ** ** ** **
ground-
fault condition from the point of a ground fault on a wiring system to the electrical s
** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **
upply source and that facilitates the operation of the overcurrent protective device or
** ** ** ** ** ** ** ** ** ** ** ** *
*ground-fault detectors. **
Effective Ground-Fault Current Path (Pg. 19)
** ** ** ** **
9. An **
is a manually operated device used in conjunction with a transfer switch
** ** ** ** ** ** ** ** ** ** ** **
to provide a means directly connecting load conductors to a power source and of d
** ** ** ** ** ** ** ** ** ** ** ** ** **
isconnecting the transfer switch. ** ** **
Bypass Isolation Switch (NEC 70-40) (Definition is updated and different in NEC 2020)
** ** ** ** ** ** ** ** ** ** ** **
10. A type of surface, flush, or freestanding raceway, designed to hold conductors a
** ** ** ** ** ** ** ** ** ** ** **
nd receptacles, assembled in the field or at the factory is called a
** ** ** ** ** ** ** ** ** ** ** **
.
Multioutlet assembly (Pg. 25) ** ** **
11. A raceway encased in 4 in. (102 mm) of concrete on the ground floor (in direct cont
** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **
act with the earth) shall be considered a(n) location.
** ** ** ** ** ** ** **
Wet (NEC 70-38)
** **
12. A (n) may consist of one or more sensing elements integral with the motor-
** ** ** ** ** ** ** ** ** ** ** ** **
compressor and an external control device. ** ** ** ** **
, Thermal Protector (NEC 70-41)
** ** **
13. An enclosure designed for either surface or flush mounting and provided with a fra
** ** ** ** ** ** ** ** ** ** ** ** **
me, mat, or trim in which a swinging door or doors are or can be hung is called a (n) .
** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** * *
Cabinet (NEC 70-33) ** **
14. A(n) is a shaft way, hatchway, well hole, or other vertical opening of space in w
*** * ** ** ** ** ** ** ** ** ** ** ** ** ** **
hich an elevator or dumbwaiter is designed to operate.
** ** ** ** ** ** ** **
Hoistway (NEC 70-37) ** **
15. A multiwire branch circuit can supply:
** ** ** ** **
1. 120/240 volts to only one piece of utilization equipment
** ** ** ** ** ** ** **
2. 120/240 volts where all ungrounded conductors are opened simultaneously
** ** ** ** ** ** ** **
a) 1 only
** ** b) 2 only ** ** c) either 1 or 2
** ** ** ** d) neither 1 or 2
** ** ** **
All conductors of a multiwire branch circuit shall originate from the same panelboard
** ** ** ** ** ** ** ** ** ** ** ** **
or similar distribution equipment. A multiwire circuit shall be permitted to be consider
** ** ** ** ** ** ** ** ** ** ** **
ed as multiple circuits. (NEC Pg. 70-60)
** ** ** ** ** **
16. An overcurrent protective device with a circuit opening fusible part that is heated an
** ** ** ** ** ** ** ** ** ** ** ** **
d severed by the passage of overcurrent through it is the definition of a(n)
** ** ** ** ** ** ** ** ** ** ** ** ** *** * .
Fuse (NEC 70-41)
** **
17. is a string of outdoor lights suspended between two points.
** ** ** ** ** ** ** ** **
Festoon Lighting (Pg. 21)
** ** **
18. Name two items that must be present when defining an area as a bathroom.
** ** ** ** ** ** ** ** ** ** ** ** **
A bathroom must have at least 1 sink and a tub, or shower, or toilet. (Pg. 13)
** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **
19. A continuous load is where the current is expected to continue for three hours or more.
** ** ** ** ** ** ** ** ** ** ** ** ** ** **
a) 80%
** b) average** c) maximum (Pg. 18) d) 125%
** ** ** * **