CESSWI Exam Part 2 Study Questions with Correct Answers Latest Edition 1. Existing Veg, Desc/Purp - ANSWER temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. 2. Existing Veg, Objectives - ANSWER a) Site Plan and Mang b) Erosi Cont c) Sedi Cont d) Post-Cons Mang 3. Existing Veg, applic - ANSWER a) Areas within site where no const activity is occur b) Areas where local, state and fed govt require preservation c) Areas where existing veg can be utilized for eros, sedi, and storm water. 4. Sediment basin: descri & purp - ANSWER a structural bmp that allows stormwater to be collected, and allows sediment present to fall out of suspension before teh water is allowed to undergo controlled release 5. Sediment basin: Object - ANSWER 1) sediment control 2) runoff control 3) post construction management 6. Sanitary waste mgmt desc purpose - ANSWER structural BMP to prevent septic/sanitary waste from being released 7. Sanitary waste mgmt obj - ANSWER good housekeeping/mater mgmt post contrution 8. Stockpile MGMT desc/purp - ANSWER procedural bmp involves storage and use of stockpiles and materials 9. Stockpile MGMT objective - ANSWER good housekeeping/mater mgmt. erosion control sediment control post construction mgmt. 10. Street cleaning objective - ANSWER good housekeeping/mater mgmt. sediment control post construction mgmt. 11. Trash containment objectives - ANSWER good housekeeping/mater mgmt. post construction mgmt. 12. Wind fence obj - ANSWER good housekeeping/mater mgmt. 13. Final Stabilization desc/purp - ANSWER all soil disturbing activities are complete all permanent stabilization measures are installed 14. Final stabilization obj - ANSWER post const mgmt erosion control 15. head/end/wing walls desc purp - ANSWER soil behind wall is stablized to prevent sediment introduction 16. head/end/wing walls obj - ANSWER post cont mgmt erosion control 17. level/ flow spreader desc/purp - ANSWER disperses concentrated runoff to sheet flow and released to areas already stabilized 18. level/ flow spreader obj - ANSWER post cont mgmt runoff control erosion control 19. Permeable surfaces obj - ANSWER post cont mgmt runoff control erosion control 20. infiltration basin/pond desc/purp - ANSWER shallow impoundment designed to infiltrate stormwater into the soil 21. infiltration basin/pond obj - ANSWER post cont mgmt runoff control sediment control 22. infiltration trench desc/purp - ANSWER rock filled trench with no outlet that recieves runoff. runoff passes through and infiltrates into soil 23. infiltration trench obj - ANSWER post const mgmt runoff control sediment control 24. Bioretention desc/purp - ANSWER uses landscape features to provide stormwater runoff treatment. may include treatment solutions and volume control 25. bioretention obj - ANSWER post const mgmt runoff control sediment control 26. permanent Catch basin insert obj - ANSWER post const mgmt sediment control 27. inline stormwater treatment devices desc/purp - ANSWER placed inline of stormwater device for removal of targetted pollutants. may split flow to treat first flush, specific pollutant.

Content preview

CESSWI Exam Part 2 Study
Questions with Correct Answers
Latest Edition

1. Existing Veg, Desc/Purp - ANSWER temp or perm bmp desi to stab soil
and remove sups part from sheet flow runoff.


2. Existing Veg, Objectives - ANSWER a) Site Plan and Mang
b) Erosi Cont
c) Sedi Cont
d) Post-Cons Mang


3. Existing Veg, applic - ANSWER a) Areas within site where no const
activity is occur
b) Areas where local, state and fed govt require preservation
c) Areas where existing veg can be utilized for eros, sedi, and storm water.


4. Sediment basin: descri & purp - ANSWER a structural bmp that allows
stormwater to be collected, and allows sediment present to fall out of
suspension before teh water is allowed to undergo controlled release


5. Sediment basin: Object - ANSWER 1) sediment control
2) runoff control
3) post construction management

,6. Sanitary waste mgmt desc purpose - ANSWER structural BMP to prevent
septic/sanitary waste from being released


7. Sanitary waste mgmt obj - ANSWER good housekeeping/mater mgmt
post contrution


8. Stockpile MGMT desc/purp - ANSWER procedural bmp involves storage
and use of stockpiles and materials


9. Stockpile MGMT objective - ANSWER good housekeeping/mater mgmt.
erosion control
sediment control
post construction mgmt.


10.Street cleaning objective - ANSWER good housekeeping/mater mgmt.
sediment control
post construction mgmt.


11.Trash containment objectives - ANSWER good housekeeping/mater mgmt.
post construction mgmt.


12.Wind fence obj - ANSWER good housekeeping/mater mgmt.


13.Final Stabilization desc/purp - ANSWER all soil disturbing activities are
complete all permanent stabilization measures are installed

,14.Final stabilization obj - ANSWER post const mgmt
erosion control


15.head/end/wing walls desc purp - ANSWER soil behind wall is stablized to
prevent sediment introduction


16.head/end/wing walls obj - ANSWER post cont mgmt
erosion control


17.level/ flow spreader desc/purp - ANSWER disperses concentrated runoff to
sheet flow and released to areas already stabilized


18.level/ flow spreader obj - ANSWER post cont mgmt
runoff control
erosion control


19.Permeable surfaces obj - ANSWER post cont mgmt
runoff control
erosion control


20.infiltration basin/pond desc/purp - ANSWER shallow impoundment
designed to infiltrate stormwater into the soil


21.infiltration basin/pond obj - ANSWER post cont mgmt
runoff control
sediment control

, 22.infiltration trench desc/purp - ANSWER rock filled trench with no outlet
that recieves runoff. runoff passes through and infiltrates into soil


23.infiltration trench obj - ANSWER post const mgmt
runoff control
sediment control


24.Bioretention desc/purp - ANSWER uses landscape features to provide
stormwater runoff treatment. may include treatment solutions and volume
control


25.bioretention obj - ANSWER post const mgmt
runoff control
sediment control


26.permanent Catch basin insert obj - ANSWER post const mgmt
sediment control


27.inline stormwater treatment devices desc/purp - ANSWER placed inline of
stormwater device for removal of targetted pollutants. may split flow to treat
first flush, specific pollutant.


28.permanent Catch basin insert desc/purp - ANSWER function to trap
sediment, debris and pollutants. may include components such as trays, filter
fabric, and plastic boxes.

Document information

Uploaded on
February 4, 2026
Number of pages
57
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
DrSammuel
5.0
(1)
Sold
7
Followers
0
Items
917
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions