100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Power Engineering 4A Mega Questions With Complete Solutions

Puntuación
-
Vendido
-
Páginas
272
Grado
A+
Subido en
01-02-2026
Escrito en
2025/2026

Power Engineering 4A Mega Questions With Complete Solutions

Institución
Power Engineering 4A
Grado
Power Engineering 4A











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Power Engineering 4A
Grado
Power Engineering 4A

Información del documento

Subido en
1 de febrero de 2026
Número de páginas
272
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Power Engineering 4A Mega Questions With Complete
Solutions

____________ heat exchangers are not usually used with steam,
because condensate does not easily drain from them.

a. Finned Tube
b. Plate type
c. Straight Tube
d. U-tube Correct Answers b. Plate type

"Transpiration" is the process where:

a. animals inhale oxygen
b. plants release water
c. dissolved oxygen is expelled from water
d. water vapour goes through a phase change Correct Answers
b. plants release water

( 4-080-2.2) When reading the dials of a kilowatt hour meter,
read:

a. Them in the sequence shown by the letters under each
b. Them from left to right
c. The ones that rotate clockwise first
d. Them from right to left Correct Answers d. Them from right
to left

( 4-081-1.13) The strength of the magnetic field produced in a
shunt wound generator:

,a. Is weak
b. Is fairly constant
c. Is regulated by an external AC supply
d. Increases with generator load Correct Answers b. Is fairly
constant

( 4-081-1.8) ___________ are used on motors and generators to
produce the strong magnetic field required by these machines.

a. Insulated wires
b. Transformers
c. Rheostats
d. Pole pieces Correct Answers d. Pole pieces

( 4-081-2.14) Synchronous motors are desirable because they
can

a. Start alternators
b. Lower the power factor of a system
c. Replace variable-speed DC motors
d. Improve the power factor of a system Correct Answers d.
Improve the power factor of a system

( 4-090-1.5) A disadvantage of a cast iron boiler is:

a. It is subject to corrosion
b. Its difficult assembly
c. Its extremely high cost
d. They are prone to leaks in-between the sections Correct
Answers d. They are prone to leaks in-between the sections

,(4-001-1.1) In the early days, owners of power plants hired
_____ workers, who started out doing manual labour and
through acquired experience they were promoted to jobs with
gradually increasing levels of skill.

A. Trained
B. Unskilled
C. Qualified
D. Highly educated Correct Answers B. Unskilled

(4-001-1.11) In a power plant, the power engineer may function
as a supervisor who directs others in the _____ operation on a
shift.

A. administrative and co-operative
B. safe and efficient
C. shipping and receiving
D. occasional careful Correct Answers B. safe and efficient

(4-001-1.3) In order to produce greater efficiency, higher boiler
pressures were used. This led to _____ due to the employment
of unqualified power plant operators.

A. Higher efficiency
B. Economic gains
C. Serious accidents
D. Safer working conditions Correct Answers C. Serious
accidents

(4-001-1.5) The holder of a Certificate of Competency, the
classification of which authorises him or her to act as a engineer,

, may sketch, construct, install, operate, repair, and give advice on
all things pertaining to any _____ in which that person is
employed.

A. Welding shop
B. Hydro plant
C. Fish plant
D. Power plant Correct Answers D. Power plant

(4-001-1.6) Unqualified individuals operating a power plant or
pressure plant risk the _____ of the plant and the general public.

a. Economy
b. Safety
c. Health
d. Resources Correct Answers b. Safety

(4-001-1.8) Power engineers are:

A. Qualified to make design changes in a power plant
B. Qualified to perform any welding jobs in a power plant
C. Automatically Safety code officers in a power plant
D. Skilled workers who operate and maintain the equipment in a
power plan Correct Answers D. Skilled workers who operate
and maintain the equipment in a power plan

(4-001-1.9) Power engineers can usually expect to work:

A. Straight 12 hour day shifts
B. Straight 8 hour night shifts
C. Straight 12 hour night shifts
$28.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Classroom NURSING
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4740
Miembro desde
3 año
Número de seguidores
3222
Documentos
53075
Última venta
12 horas hace
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Lee mas Leer menos
4.0

1168 reseñas

5
615
4
213
3
192
2
39
1
109

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes