Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

3B2 Power Engineer Exam Practice Questions With 100% Correct Answers

Document preview thumbnail
Preview 4 out of 35 pages

3B2 Power Engineer Exam Practice Questions With 100% Correct Answers Q.The disadvantages of a gas turbine are: 1. High cost of manufacture 2. High levels of noise pollution are produced 3. Low thermal efficiency 4. Requires many auxiliaries to be efficient A. 1, 2, 3 B. 1, 3, 4 C. 2, 3, 4 D. 1, 2, 4 E. 1, 2, 3, 4 - ANSWERS-E Q.The most common process method of refrigeration is: Select one: A. Absorption B. Lithium bromide C. Water vapor D. Vapor compression or mechanical E. Ammonia compression system - ANSWERS-D Q.To facilitate the removal of moisture and oil from the compressed air, a/an _____ is installed. Select one: A. Intercooler B. Oil separator C. Unloader D. Expansion tank E. Aftercooler - ANSWERS-E Q.In a two-stage refrigeration system, the 1st stage compressor is also known as a _____ compressor. Select one: A. Booster B. Standby C. Low volume D. Extraction E. Refrigerant - ANSWERS-A Q.In the rotary vane compressor: Select one: A. Vanes close to the central hub by centrifugal force B. There is a rotor in the exact center of the casing C. Refrigerant is trapped between the roller and the decreasing volume of the eccentric casing D. The rotor oscillates E. The vanes move in the rotor - ANSWERS-E Q.In a gas turbine, there are fewer turbine stages than compressor stages because: Select one: A. Energy can be extracted more efficiently in the turbine B. Turbine blades are bigger so require fewer C. Higher exhaust temperatures can be tolerated D. The hot gases occupy more volume E. Hot exhaust gases are required for the HRSG's - ANSWERS-A Q.Pressure limiting devices of refrigeration systems shall be connected: Select one: A. Between the compressor and the stop valve on the suction side B. To a blowdown tank C. Between the inlet of the condenser and the outlet of the receiver D. Between the compressor and the stop valve on the discharge side E. To the receiver outlet - ANSWERS-D Q.The warm-up time required of a turbine is dependant on: Select one: A. How quickly the turbine is required B. The manufacturer's instructions C. The size of the turbine D. The type of turbine E. Whether the steam is dry or wet - ANSWERS-C Q._____ compressors require intake and discharge valves.

Content preview

3B2 Power Engineer Exam Practice
Questions With 100% Correct Answers



\Q\.The disadvantages of a gas turbine are:

1. High cost of manufacture

2. High levels of noise pollution are produced

3. Low thermal efficiency

4. Requires many auxiliaries to be efficient



A. 1, 2, 3

B. 1, 3, 4

C. 2, 3, 4

D. 1, 2, 4

E. 1, 2, 3, 4 - ANSWERS✔-E



\Q\.The most common process method of refrigeration is:

Select one:

A. Absorption

B. Lithium bromide

C. Water vapor

D. Vapor compression or mechanical

E. Ammonia compression system - ANSWERS✔-D

,\Q\.To facilitate the removal of moisture and oil from the compressed air, a/an _____ is
installed.

Select one:

A. Intercooler

B. Oil separator

C. Unloader

D. Expansion tank

E. Aftercooler - ANSWERS✔-E



\Q\.In a two-stage refrigeration system, the 1st stage compressor is also known as a _____
compressor.

Select one:

A. Booster

B. Standby

C. Low volume

D. Extraction

E. Refrigerant - ANSWERS✔-A



\Q\.In the rotary vane compressor:

Select one:

A. Vanes close to the central hub by centrifugal force

B. There is a rotor in the exact center of the casing

C. Refrigerant is trapped between the roller and the decreasing volume of the eccentric casing

D. The rotor oscillates

E. The vanes move in the rotor - ANSWERS✔-E

,\Q\.In a gas turbine, there are fewer turbine stages than compressor stages because:

Select one:

A. Energy can be extracted more efficiently in the turbine

B. Turbine blades are bigger so require fewer

C. Higher exhaust temperatures can be tolerated

D. The hot gases occupy more volume

E. Hot exhaust gases are required for the HRSG's - ANSWERS✔-A



\Q\.Pressure limiting devices of refrigeration systems shall be connected:

Select one:

A. Between the compressor and the stop valve on the suction side

B. To a blowdown tank

C. Between the inlet of the condenser and the outlet of the receiver

D. Between the compressor and the stop valve on the discharge side

E. To the receiver outlet - ANSWERS✔-D



\Q\.The warm-up time required of a turbine is dependant on:

Select one:

A. How quickly the turbine is required

B. The manufacturer's instructions

C. The size of the turbine

D. The type of turbine

E. Whether the steam is dry or wet - ANSWERS✔-C



\Q\._____ compressors require intake and discharge valves.

, Select one:

A. Rotary

B. Centrifugal

C. Sliding vane

D. Rotary lobe

E. Reciprocating - ANSWERS✔-E



\Q\.Besides reducing NOx, water injection systems

Select one:

a. stabilize the combustion process, thereby increasing the life of hot section components

b. help keep the compressor blading clean

c. reduce the gas turbine's thermal efficiency

d. decrease the power output - ANSWERS✔-C



\Q\.The pressure at the outlet from the moving blades is the same as the pressure at the inlet to
the moving blades in a/an __________ turbine.

Select one:

A. Topping

B. Reaction

C. Back pressure

D. Impulse

E. Extraction - ANSWERS✔-D



\Q\.A condenser shell may be fitted with an expansion joint if the:

Select one:

A. Expected temperature differentials will be greater than 20°C

Document information

Uploaded on
February 1, 2026
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd
5.0
(3)
Sold
49
Followers
3
Items
6052
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions