• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

Lean Midterm Questions With Complete Solutions

Document preview thumbnail
Preview 3 out of 17 pages

Lean Midterm Questions With Complete Solutions

Content preview

Lean Midterm Questions With Complete Solutions

'A' items use what type of line design Correct Answers
dedicated lines

'B' items use what type of line design Correct Answers shared
lines- linear, U-form

'C' items use what type of line design Correct Answers
departments or job shops

2 poka-yoke categories Correct Answers 1. control poka-yoke:
worker alerted, line stopped
2. warning poka-yoke: worker alerted only

3 control poka-yoke methods Correct Answers 1. contact
method
- detect abnormalities in work piece size, shape, orientation,
position, etc
2. altogether method
- ensures that all steps of an operation have been successfully
completed
3. action step method
- worker takes some action which is not part of the normal
operations routine

3 improvement avenues in lean Correct Answers 5S
standardization
TPM

,4 approaches to detecting the problem and stopping the process
in Jidoka Correct Answers 1. line stops on manual production
lines
2. poka-yoke devices
3. mistake-proofing devices
4. autonomous machines

4 basic setup time reduction concepts Correct Answers 1.
separate the internal setup from the external setup
2. convert as much as possible of the internal setup to the
external setup
3. eliminate the adjustment process
4. abolish the setup itself

4 kinds of muda in manufacturing Correct Answers excessive
production resources (workforce, facilities)
overproduction
excessive inventories
unnecessary capital investment

6 basic setup time reduction techniques Correct Answers 1.
standardize the external setup actions
2. standardize only the necessary portions of the machine
3. quick fasteners
4. use supplementary tooling
5. use parallel operations
6. use a mechanical setup systems

a high variance and skewed distribution results in Correct
Answers max daily inventories
difficulty for part suppliers

, difficulty in running the line

all units inspection Correct Answers lot (batch) production
using automated equipment

- first and last unit of each lot are inspected, so if both are good
then the entire lot is considered to be good

alternative configurations to having batch production with
individual machines Correct Answers 1. conveyors or chutes
- close distances
- MG and buffer
- BUT it encourages WIP and isolates the workers
2. Full-work control
- close distances
- controls WIP
3. single buffer
- close distances
4. separate input/ output buffers
- farther distances

Andon and call lights Correct Answers call light: light on
means supervisor, maintenance worker, or general worker is
needed
andon: board providing information on state of line

autonomous machines Correct Answers machine with an
automatic stopping device

IMPORTANT IN LEAN BECAUSE they made multi-process
handling and all units inspection possible

Document information

Uploaded on
January 30, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1213)
Sold
5015
Followers
3246
Items
56732
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions