Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS | GUARANTEED PASS

Document preview thumbnail
Preview 2 out of 5 pages

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS | GUARANTEED PASS

Content preview

OPMA 3306 FINAL EXAM REVIEW QUESTIONS| PASS |
GUARANTEED PASS


A BOM file is also called which of the following - Answers -Product Tree

MRP stands for Material Requirements Planning - Answers -True

A project can be subdivided into which of the following - Answers -work packages

MRP is most valuable where a number of products are made in batches using the same
productive equipment - Answers -True

PERT is an abbreviation for which of the following methodologies - Answers -Program
Evaluation and Review Technique

How many free trade zones are there in the US - Answers -about 260

A master production schedule is an input to a material requirements planning (MRP)
system - Answers -True

An input to the material requirements planning (MRP) system is an exception report -
Answers -False

Which of the following are eligible companies to be considered for the Baldrige award -
Answers -auditing firms

An input to the material requirements planning (MRP) system is an inventory records file
- Answers -True

MRP systems seek to achieve - Answers -determine the number of dependent demand
items needed

A modular bill of materials includes items with fractional options - Answers -False

An analytical tool used in six-sigma quality improvement programs is which of the
following - Answers -checksheets

In monitoring process quality we might use which of the following statistics - Answers -
difference between the highest and lowest value in a sample

Quality of life in a host community is not a major factor in making the facility location
decision - Answers -False

, AQL stands for accepting questionable lots in production quality management -
Answers -False

Net change MRP systems are "activity" driven - Answers -True

A BOM file is also called - Answers -Product Tree

Which of the following should we use an "R" chart to monitor process quality - Answers
-tire pressures in an auto assembly plant

In a net change MRP system requirements and schedules are considered rigid and
never updated - Answers -False

What is a work breakdown structure - Answers -A definition of the hierarchy of project
tasks, subtasks, and work packages

Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Answers -False

For which of the following should we use a "p" chart to monitor process quality -
Answers -Defective electrical switches

Breakthrough projects are those that provide fundamental improvements to existing
products - Answers -False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Answers -True

"Projected available balance" is a term referring to unsold finished goods inventory -
Answers -False

When implemented correctly, MRP links all areas of the business. - Answers -False

Which of the following is not a production activity report generated by MRP - Answers -
Bill of Materials report

Time fences are periods of time having some specified level of opportunity for the
customer to make changes. - Answers -True

TQM is an acronym meaning "total quality measurement." - Answers -False

One SPC tool used in total quality management is the Pareto chart. - Answers -True

An operational goal of total quality management is the careful design of the product or
service - Answers -True

Document information

Uploaded on
January 30, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(360)
Sold
2133
Followers
1447
Items
58229
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions