A BOM file is also called which of the following - Answers -Product Tree
MRP stands for Material Requirements Planning - Answers -True
A project can be subdivided into which of the following - Answers -work packages
MRP is most valuable where a number of products are made in batches using the same
productive equipment - Answers -True
PERT is an abbreviation for which of the following methodologies - Answers -Program
Evaluation and Review Technique
How many free trade zones are there in the US - Answers -about 260
A master production schedule is an input to a material requirements planning (MRP)
system - Answers -True
An input to the material requirements planning (MRP) system is an exception report -
Answers -False
Which of the following are eligible companies to be considered for the Baldrige award -
Answers -auditing firms
An input to the material requirements planning (MRP) system is an inventory records file
- Answers -True
MRP systems seek to achieve - Answers -determine the number of dependent demand
items needed
A modular bill of materials includes items with fractional options - Answers -False
An analytical tool used in six-sigma quality improvement programs is which of the
following - Answers -checksheets
In monitoring process quality we might use which of the following statistics - Answers -
difference between the highest and lowest value in a sample
Quality of life in a host community is not a major factor in making the facility location
decision - Answers -False
, AQL stands for accepting questionable lots in production quality management -
Answers -False
Net change MRP systems are "activity" driven - Answers -True
A BOM file is also called - Answers -Product Tree
Which of the following should we use an "R" chart to monitor process quality - Answers
-tire pressures in an auto assembly plant
In a net change MRP system requirements and schedules are considered rigid and
never updated - Answers -False
What is a work breakdown structure - Answers -A definition of the hierarchy of project
tasks, subtasks, and work packages
Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Answers -False
For which of the following should we use a "p" chart to monitor process quality -
Answers -Defective electrical switches
Breakthrough projects are those that provide fundamental improvements to existing
products - Answers -False
A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Answers -True
"Projected available balance" is a term referring to unsold finished goods inventory -
Answers -False
When implemented correctly, MRP links all areas of the business. - Answers -False
Which of the following is not a production activity report generated by MRP - Answers -
Bill of Materials report
Time fences are periods of time having some specified level of opportunity for the
customer to make changes. - Answers -True
TQM is an acronym meaning "total quality measurement." - Answers -False
One SPC tool used in total quality management is the Pareto chart. - Answers -True
An operational goal of total quality management is the careful design of the product or
service - Answers -True
GUARANTEED PASS
A BOM file is also called which of the following - Answers -Product Tree
MRP stands for Material Requirements Planning - Answers -True
A project can be subdivided into which of the following - Answers -work packages
MRP is most valuable where a number of products are made in batches using the same
productive equipment - Answers -True
PERT is an abbreviation for which of the following methodologies - Answers -Program
Evaluation and Review Technique
How many free trade zones are there in the US - Answers -about 260
A master production schedule is an input to a material requirements planning (MRP)
system - Answers -True
An input to the material requirements planning (MRP) system is an exception report -
Answers -False
Which of the following are eligible companies to be considered for the Baldrige award -
Answers -auditing firms
An input to the material requirements planning (MRP) system is an inventory records file
- Answers -True
MRP systems seek to achieve - Answers -determine the number of dependent demand
items needed
A modular bill of materials includes items with fractional options - Answers -False
An analytical tool used in six-sigma quality improvement programs is which of the
following - Answers -checksheets
In monitoring process quality we might use which of the following statistics - Answers -
difference between the highest and lowest value in a sample
Quality of life in a host community is not a major factor in making the facility location
decision - Answers -False
, AQL stands for accepting questionable lots in production quality management -
Answers -False
Net change MRP systems are "activity" driven - Answers -True
A BOM file is also called - Answers -Product Tree
Which of the following should we use an "R" chart to monitor process quality - Answers
-tire pressures in an auto assembly plant
In a net change MRP system requirements and schedules are considered rigid and
never updated - Answers -False
What is a work breakdown structure - Answers -A definition of the hierarchy of project
tasks, subtasks, and work packages
Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Answers -False
For which of the following should we use a "p" chart to monitor process quality -
Answers -Defective electrical switches
Breakthrough projects are those that provide fundamental improvements to existing
products - Answers -False
A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Answers -True
"Projected available balance" is a term referring to unsold finished goods inventory -
Answers -False
When implemented correctly, MRP links all areas of the business. - Answers -False
Which of the following is not a production activity report generated by MRP - Answers -
Bill of Materials report
Time fences are periods of time having some specified level of opportunity for the
customer to make changes. - Answers -True
TQM is an acronym meaning "total quality measurement." - Answers -False
One SPC tool used in total quality management is the Pareto chart. - Answers -True
An operational goal of total quality management is the careful design of the product or
service - Answers -True