What group can approve a change in the Disturbance Recovery Period for an
Interconnection?
a. NERC Interconnection Working Group
b. NERC Operating Committee
c. NERC Regional Council
d. NERC Disturbance Analysis Working Group - ANSWER b. NERC Operating
Committee
What is the first thing an operator should do after a relay operation?
a. Check power system stabilizers
b. Notify adjacent Transmission and Balancing areas
c. Check targets and equipment
d. Notify their PSE that the transmission path is out of service - ANSWER c. Check
targets and equipment
For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency
calculations, and all ________ must be metered.
a. Communications
b. Transformers
c. Tie Lines
d. Generation - ANSWER c. Tie Lines
What Energy Alert Level would the following example be categorized as?
1
,"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
experiencing conditions where all available resources are committed to meet firm load, firm
transactions, etc, and requests an Energy Emergency Alert."
a. Energy Emergency Alert Level IV
b. Energy Emergency Alert Level III
c. Energy Emergency Alert Level I
d. Energy Emergency Alert Level II - ANSWER c. Energy Emergency Alert Level I
You are a Reliability Coordinator in the Eastern Interconnection. A flow gate has become
overloaded because a parallel 345kV line has relayed out and part of that load has
transferred over to the flow gate causing an SOL and possible IROL violation. What would
you do to relieve this violation?
a. Notify another Reliability Coordinator and ask them if they are having any problem, and
what should you do.
b. Implement the appropriate congestion management procedure.
c. Issue a Transmission warning to the Transmission Operators that lost the 345kV line.
d. Place the line back in service within 30 minutes. - ANSWER b. Implement the
appropriate congestion management procedure.
Interchange schedules may be implemented between _______________________.
a. Source and Sink Balancing Authorities
b. Adjacent Balancing Authorities
c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
d. Balancing Authorities in the same Interconnection. - ANSWER b. Adjacent
Balancing Authorities
When the frequency of an Interconnection decreases due to the loss of a large generator,
the ________________ until the combination of both ____________ and ______________
replace the output of the lost generator.
a. Frequency will continue to drop, generator governor response, decrease in load
2
, b. Frequency will continue to drop, generator governor response, voltage regulating
transformer response
c. Voltage will continue to raise, generator AVR response, voltage regulating transformer
response
d. Voltage will continue to raise, generator AVR response, decrease in load -
ANSWER a. Frequency will continue to drop, generator governor response, decrease
in load.
In developing and setting up an Arranged Interchange, which of the following would
transition the Arranged Interchange to the Confirmed Interchange status?
a. That all involved reliability entities determined that there is no reliability problems with
the Arranged Interchange.
b. The Department of Energy (DOE) made an in-depth study of the Interchange Agreement
and determined that it would have an adverse affect on the Interconnection.
c. There are available resources to meet the load.
d. All parties involved realized that they would not lose money for their company with this
Interchange Agreement. - ANSWER a. That all involved reliability entities determined
that there is no reliability problems with the Arranged Interchange.
Early in the afternoon, a system operator notices that frequency has dropped to 59.95Hz and
his balancing area's ACE is 0. In order to correct the under frequency condition, the operator
pulses his generators to increase generation. Which statement best describes his actions?
a. He followed NERC guidelines
b. He violated NERC standards
c. He helped the system
d. He has not impacted the system - ANSWER b. He violated NERC standards
Voltage of a 345kV transmission line is at 90% of normal. If you energize a capacitor rated at
100MVar, what will the actual MVars gained?
a. 60 MVars
b. 30 MVars
3
Interconnection?
a. NERC Interconnection Working Group
b. NERC Operating Committee
c. NERC Regional Council
d. NERC Disturbance Analysis Working Group - ANSWER b. NERC Operating
Committee
What is the first thing an operator should do after a relay operation?
a. Check power system stabilizers
b. Notify adjacent Transmission and Balancing areas
c. Check targets and equipment
d. Notify their PSE that the transmission path is out of service - ANSWER c. Check
targets and equipment
For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency
calculations, and all ________ must be metered.
a. Communications
b. Transformers
c. Tie Lines
d. Generation - ANSWER c. Tie Lines
What Energy Alert Level would the following example be categorized as?
1
,"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
experiencing conditions where all available resources are committed to meet firm load, firm
transactions, etc, and requests an Energy Emergency Alert."
a. Energy Emergency Alert Level IV
b. Energy Emergency Alert Level III
c. Energy Emergency Alert Level I
d. Energy Emergency Alert Level II - ANSWER c. Energy Emergency Alert Level I
You are a Reliability Coordinator in the Eastern Interconnection. A flow gate has become
overloaded because a parallel 345kV line has relayed out and part of that load has
transferred over to the flow gate causing an SOL and possible IROL violation. What would
you do to relieve this violation?
a. Notify another Reliability Coordinator and ask them if they are having any problem, and
what should you do.
b. Implement the appropriate congestion management procedure.
c. Issue a Transmission warning to the Transmission Operators that lost the 345kV line.
d. Place the line back in service within 30 minutes. - ANSWER b. Implement the
appropriate congestion management procedure.
Interchange schedules may be implemented between _______________________.
a. Source and Sink Balancing Authorities
b. Adjacent Balancing Authorities
c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
d. Balancing Authorities in the same Interconnection. - ANSWER b. Adjacent
Balancing Authorities
When the frequency of an Interconnection decreases due to the loss of a large generator,
the ________________ until the combination of both ____________ and ______________
replace the output of the lost generator.
a. Frequency will continue to drop, generator governor response, decrease in load
2
, b. Frequency will continue to drop, generator governor response, voltage regulating
transformer response
c. Voltage will continue to raise, generator AVR response, voltage regulating transformer
response
d. Voltage will continue to raise, generator AVR response, decrease in load -
ANSWER a. Frequency will continue to drop, generator governor response, decrease
in load.
In developing and setting up an Arranged Interchange, which of the following would
transition the Arranged Interchange to the Confirmed Interchange status?
a. That all involved reliability entities determined that there is no reliability problems with
the Arranged Interchange.
b. The Department of Energy (DOE) made an in-depth study of the Interchange Agreement
and determined that it would have an adverse affect on the Interconnection.
c. There are available resources to meet the load.
d. All parties involved realized that they would not lose money for their company with this
Interchange Agreement. - ANSWER a. That all involved reliability entities determined
that there is no reliability problems with the Arranged Interchange.
Early in the afternoon, a system operator notices that frequency has dropped to 59.95Hz and
his balancing area's ACE is 0. In order to correct the under frequency condition, the operator
pulses his generators to increase generation. Which statement best describes his actions?
a. He followed NERC guidelines
b. He violated NERC standards
c. He helped the system
d. He has not impacted the system - ANSWER b. He violated NERC standards
Voltage of a 345kV transmission line is at 90% of normal. If you energize a capacitor rated at
100MVar, what will the actual MVars gained?
a. 60 MVars
b. 30 MVars
3