UST SERVICE TECHNICIAN PRACTICE
SOLUTION 2026 SOLVED ITEMS CONFIRMED
A+
◉ Type B Fire Extinguisher. Answer: Puts out flammable and
combustible liquids.
◉ Type C Fire Extinguisher. Answer: Puts out electrical fires.
◉ According to CCR, Title 23 UST Regulations, what is the frequency
that the monitor system certification must be performed?. Answer:
12 month
◉ If visual monitoring is utilized as the means of release detection
for a single walled tank, it must be conducted on a _____ basis..
Answer: daily
◉ The purpose of spill and overfill protection equipment is to
minimize the potential for a release during _____.. Answer: fuel
deliveries
◉ Which of the following is a potential symptom of toxic petroleum
exposure?
,a. dizziness
b. tremors
c. eye irritation
d. all the above. Answer: d. all the above
◉ Under-dispenser containment is required for _____ underground
storage tank systems.. Answer: all
◉ All of the following are true for Automatic Tank Gauging except
for...
a. ATG system consists of a probe installed in a tank
b. ATG systems are required to be installed in all UST systems
c. ATG systems have a control panel that can provide information on
product level and temperature
d. ATG systems can be programmed to calculate the changes in
product volume to determine if a tank is leaking. Answer: b. ATG
systems are required to be installed in all UST systems
◉ According to CCR Title 23, UST regulations, spill containment
must meet all of the following requirements except:
, a. be installed on vent risers
b. have a minimum capacity of 5 gallons
c. collect any hazardous substance
d. be equipped with a a drain valve or other means to keep the spill
container empty. Answer: a. be installed on vent risers
◉ Suction piping may not require leak detection if it has only one
check valve located where?. Answer: directly below the suction
pump
◉ Service technician performing work on monitoring equipment
must be trained by _____.. Answer: the manufacturer of the
equipment
◉ Air monitoring must be conducted _____ performing work within a
confined space.. Answer: Prior to and during.
◉ A UST service technician must be recertified by the equipment
manufacturer at the time interval recommended by the equipment
manufacturer or at least every _____ months. Which ever is greater..
Answer: 36 months
◉ When an automatic tank gauge is utilized for singel-walled tank
leak detection, it shall test the tank at least monthly after product
SOLUTION 2026 SOLVED ITEMS CONFIRMED
A+
◉ Type B Fire Extinguisher. Answer: Puts out flammable and
combustible liquids.
◉ Type C Fire Extinguisher. Answer: Puts out electrical fires.
◉ According to CCR, Title 23 UST Regulations, what is the frequency
that the monitor system certification must be performed?. Answer:
12 month
◉ If visual monitoring is utilized as the means of release detection
for a single walled tank, it must be conducted on a _____ basis..
Answer: daily
◉ The purpose of spill and overfill protection equipment is to
minimize the potential for a release during _____.. Answer: fuel
deliveries
◉ Which of the following is a potential symptom of toxic petroleum
exposure?
,a. dizziness
b. tremors
c. eye irritation
d. all the above. Answer: d. all the above
◉ Under-dispenser containment is required for _____ underground
storage tank systems.. Answer: all
◉ All of the following are true for Automatic Tank Gauging except
for...
a. ATG system consists of a probe installed in a tank
b. ATG systems are required to be installed in all UST systems
c. ATG systems have a control panel that can provide information on
product level and temperature
d. ATG systems can be programmed to calculate the changes in
product volume to determine if a tank is leaking. Answer: b. ATG
systems are required to be installed in all UST systems
◉ According to CCR Title 23, UST regulations, spill containment
must meet all of the following requirements except:
, a. be installed on vent risers
b. have a minimum capacity of 5 gallons
c. collect any hazardous substance
d. be equipped with a a drain valve or other means to keep the spill
container empty. Answer: a. be installed on vent risers
◉ Suction piping may not require leak detection if it has only one
check valve located where?. Answer: directly below the suction
pump
◉ Service technician performing work on monitoring equipment
must be trained by _____.. Answer: the manufacturer of the
equipment
◉ Air monitoring must be conducted _____ performing work within a
confined space.. Answer: Prior to and during.
◉ A UST service technician must be recertified by the equipment
manufacturer at the time interval recommended by the equipment
manufacturer or at least every _____ months. Which ever is greater..
Answer: 36 months
◉ When an automatic tank gauge is utilized for singel-walled tank
leak detection, it shall test the tank at least monthly after product