• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CSSYB || 100% Errorless Answers.

Document preview thumbnail
Preview 2 out of 8 pages

CSSYB || 100% Errorless Answers.

Content preview

CSSYB || 100% Errorless Answers.
The purpose of Six Sigma correct answers Reduce variation

Six Sigma Black Belts correct answers Leads problem-solving projects. Trains and coaches
project teams.

Six Sigma Yellow Belt correct answers Participates as a project team member. Reviews process
improvements that support the project.

Six Sigma Green Belts correct answers Assists with data collection and analysis for Black Belt
projects. Leads Green Belt projects or teams.

Six Sigma Master Black Belt correct answers Trains and coaches Black Belts and Green Belts.
Functions more at the Six Sigma program level by developing key metrics and the strategic
direction. Acts as an organization's Six Sigma technologist and internal consultant.

Champion correct answers Translate the company's vision, mission, goals and metrics to create
an organizational deployment plan and identify individual projects. Identify resources and
remove roadblocks.

7 quality control tools correct answers Cause-and-effect diagram (also called Ishikawa diagram
or fishbone diagram)
Check sheet
Control chart
Histogram
Pareto chart
Scatter diagram
Stratification

cause and effect diagram correct answers fishbone diagram: identifies many possible causes for
an effect or problem. It can be used to structure a brainstorming session. It immediately sorts
ideas into useful categories.

Check Sheet correct answers a structured, prepared form for collecting and analyzing data.

Control Chart correct answers scatterplot: a statistical chart of time-ordered values of a sample
statistic

Histogram correct answers A graph of vertical bars representing the frequency distribution of a
set of data.

Pareto Chart correct answers a bar graph whose bars are drawn in decreasing order of frequency
or relative frequency

, scatter diagram correct answers a graph that shows the degree and direction of relationship
between two variables

Stratification correct answers The act of sorting data, people, and objects into distinct groups or
layers

DPU correct answers defects per unit or (total number of defects)/(total number of units)

DPMO correct answers defects per million opportunities or DPU*million

Rolled Throughput Yield (RTY) correct answers The probability that a process with more than
one step will produce a defect free unit: YRT = YTP at step 1 * YTP at step 2 * YTP at step 3

cycle time correct answers the time needed to complete a process

COPQ correct answers Cost of Poor Quality:
Projects that are aimed at eliminating rework that is generally difficult to measure, but is
financially significant

Process Owner correct answers responsible for the management of processes within the
organization.

Project Sponsor correct answers a leader who sponsors a specific Lean Six Sigma project and
comprehends the advantages of Lean Six Sigma. The sponsor has the authority to allocate
resources for training and completing projects, and to remove roadblocks that may arise
throughout the course of the Lean Six Sigma project.

JIT Lean correct answers Just in Time. A system that eliminates work-in-process (WIP)
inventory by scheduling arrival of parts and assemblies for an operation at the time they are
needed and not before.

Poka-yoke Lean correct answers mistake-proofing methods aimed at designing fail-safe systems
that minimize human error

Kanban Lean correct answers a LEAN and JIT tool to control the flow of raw materials and
Work In Progress into and out of the production system

Value Stream Mapping Lean correct answers a technique — developed from Lean
manufacturing — that organizations use to create a visual guide of all the components necessary
to deliver a product or service, with the goal of analyzing and optimizing the entire process

continuous improvement teams correct answers consist of small groups of volunteers or workers
and supervisors who meet intermittently to discuss workplace and quality related problems

self-managed teams correct answers groups of workers who are given administrative oversight
for their task domains

Document information

Uploaded on
January 25, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
810
Followers
438
Items
40068
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions