Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

BUAD 341 EXAMINATION TEST 1 2026 FULL QUESTIONS AND VERIFIED SOLUTIONS

Document preview thumbnail
Preview 2 out of 8 pages

BUAD 341 EXAMINATION TEST 1 2026 FULL QUESTIONS AND VERIFIED SOLUTIONS

Content preview

BUAD 341 EXAMINATION TEST 1 2026 FULL
QUESTIONS AND VERIFIED SOLUTIONS

◉ 11) OSHA regulations require hook replacement if the opening
exceeds what percentage of its original throat opening? Answer:
15%


◉ 12) At what percentage of increase in length should a chain sling
be removed from service? Answer: 5%


◉ 13) The methodical process that attempts to identify hazards and
devise plans to overcome or eliminate hazards which may interfere
with crane or rigging is called: Answer: Lift plan


◉ 14) What provides additional control of a load being lifted?
Answer: Tag lines


◉ 15) When traveling on a rubber tire mobile crane, how should the
boom be positioned? Answer: In line with the direction of travel


◉ 16) Before performing pick and carry operations with any mobile
crane, it is important to: Answer: Refer to the manufacturer's
capacity chart

, ◉ 17 ) According to ASME B30.5 , a two crane lift is signaled by
Answer: One designated person


◉ 18) How much force would be required to move an object up an
inclined plane compared to lifting it vertically? Answer: Less force


◉ 20) All of the following are reasons for stopping personnel lifting
operations EXCEPT Answer: There are no tag lines


◉ 22) The point of any object's weight can be assumed to be
concentrated at: Answer: Center of gravity


◉ 23) In a spur-gear chain hoist with a two chain system, the
endless chain is used to Answer: Raise and lower the load


◉ 24) In an emergency situation, what is the rigger's FIRST priority?
Answer: To prevent injury or loss of life


◉ 25) All of the following conditions exert dynamic loading on a
crane EXCEPT: Answer: Static boom angle


◉ 26) Proper lead sheave placement as it relates to the hoisting
drum location is: Answer: Proper spooling of wire rope

Document information

Uploaded on
January 24, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.2
(15)
Sold
174
Followers
5
Items
56664
Last sold
10 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions