Management CCQMP Exam
**Question 1. Which project delivery method places the responsibility for design and
construction on a single entity, thereby minimizing owner’s coordination effort?**
A) EPCM
B) Design‑Build
C) Design‑Bid‑Build
D) Construction‑Management‑At‑Risk
Answer: B
Explanation: In Design‑Build the contractor handles both design and construction, reducing the
owner’s need to coordinate separate entities.
**Question 2. In a FIDIC Red Book contract, which clause most directly addresses the
contractor’s obligation to implement a Quality Management System?**
A) Clause 4 – The Engineer
B) Clause 8 – Commencement, Delays and Suspension
C) Clause 13 – Risk and Responsibility
D) Clause 4.1 – Contractor’s General Obligations
Answer: D
Explanation: Clause 4.1 requires the contractor to execute the works in accordance with the
contract, including compliance with a QMS.
**Question 3. Which payment model links a portion of the contractor’s progress payment to the
successful completion of a quality milestone?**
A) Fixed‑price lump sum
B) Cost‑plus with fee
C) Milestone‑based payment
D) Unit‑price schedule
, AICM Certified Construction Quality
Management CCQMP Exam
Answer: C
Explanation: Milestone‑based payments release funds only after predefined quality‑related
deliverables are verified.
**Question 4. In stakeholder mapping, which group is primarily concerned with the long‑term
performance of installed building systems?**
A) Sub‑contractors
B) End‑users/occupants
C) Procurement department
D) Project scheduler
Answer: B
Explanation: End‑users/occupants evaluate how well the building functions over its lifecycle,
reflecting quality expectations.
**Question 5. ISO 9001 emphasizes which of the following as the core of a Quality Management
System?**
A) Continuous improvement
B) Cost reduction
C) Supplier diversification
D) Marketing strategy
Answer: A
Explanation: Continuous improvement is a fundamental principle of ISO 9001, driving
systematic enhancements.
**Question 6. The Project Quality Plan (PQP) should be aligned with which project element to
ensure realistic scheduling of inspections?**
A) Procurement schedule
, AICM Certified Construction Quality
Management CCQMP Exam
B) Critical path method schedule
C) Stakeholder register
D) Cost baseline
Answer: B
Explanation: Aligning the PQP with the CPM schedule ensures inspections occur at appropriate
workflow points.
**Question 7. When integrating the PQP with the Health, Safety, and Environment (HSE) plan,
which activity is most critical?**
A) Merging budget line items
B) Coordinating permit‑to‑work procedures with quality hold points
C) Consolidating subcontractor lists
D) Updating project logo
Answer: B
Explanation: Permit‑to‑work procedures must be synchronized with quality hold points to avoid
safety‑quality conflicts.
**Question 8. ESG considerations in construction quality most directly affect which
specification?**
A) Structural load capacity
B) Low‑VOC material selection
C) Steel reinforcement grade
D) Concrete slump test
Answer: B
Explanation: Selecting low‑VOC (volatile organic compound) materials addresses environmental
sustainability goals.
, AICM Certified Construction Quality
Management CCQMP Exam
**Question 9. During the design phase, which document translates client requirements into
measurable technical criteria?**
A) Project charter
B) Design Basis Statement
C) Procurement schedule
D) Earned value report
Answer: B
Explanation: The Design Basis Statement captures client needs and converts them into technical
specifications.
**Question 10. Constructability reviews are typically performed at which design completion
percentages?**
A) 10 % and 20 %
B) 30 %, 60 % and 90 %
C) 100 % only
D) 45 % and 75 %
Answer: B
Explanation: Reviews at 30 %, 60 % and 90 % allow early detection of constructability issues.
**Question 11. Which requirement is considered non‑functional in a building project?**
A) Number of parking spaces
B) Fire‑rating of walls
C) Floor‑to‑ceiling height
D) Structural column size
Answer: B