Contingency Analysis & Reliability || A+ Graded.
What is an Operating Instruction?
- Any conversation between two or more parties related to the reliability of the BES
- A documented procedure or process for addressing an IROL exceedance
- Real-time Operating personnel command to change or preserve the state of an element of the
BES
- Managers command to shed load correct answers - Real-time Operating personnel command to
change or preserve the state of an element of the BES
A Generator Operator receives an Operating Instruction from its Transmission Operator to bring
on additional generation to mitigate a low voltage situation. The Generator Operator must
comply with the Operating Instruction unless:
- The Generator Operator disagrees with the Operating Instruction
- It results in safety concerns or environmental violations
- It has serious financial implications
- The operator is in the middle of shift turnover correct answers - It results in safety concerns or
environmental violations
TOP 001, R3
The Transmission Operator experiences an unexpected line outage which results in the
subsequent loading of a parallel line at 101% of its SOL, what action should the Transmission
Operator take?
- Inform the Reliability Coordinator
- Wait until load decreases
- Take the appropriate action to return the system to within normal limits
- Open the overloaded line correct answers - Inform the Reliability Coordinator
- Take the appropriate action to return the system to within normal limits
Following a contingency or other event resulting in an Interconnection Reliability Operating
Limit (IROL) violation, the Transmission Operator shall return to within the IROL as soon as
possible, but no longer than ______.
- 15 minutesIts
- IROL Tv
- 30 minutes
- 60 minutes correct answers Its IROL Tv
A Transmission Operator performs a Real-time Assessment that identifies a SOL exceedance.
What should the Transmission Operator do next?
- Shed load required to return to the SOL limit
,- Contact the Reliability Coordinator and ask for assistance
- Isolate the line with the exceedance
- Initiate its Operating Plan to mitigate the SOL exceedance correct answers - Initiate its
Operating Plan to mitigate the SOL exceedance
When another Transmission Operator requests emergency actions to be implemented in your
area, what is the expectation?
- The requesting TOP has also implemented emergency actions
- You assist immediately without asking questions
- The Reliability Coordinator must make the request
- Uncontrolled cascading outages are imminent correct answers - The requesting TOP has also
implemented emergency actions
Which of the following actions would a Transmission Operator be expected to take, or direct
others to take, to mitigate SOL and IROL violations? Select all that apply.
- Shed load
- Change limit
- Disconnect from neighbors
- Reduce Interchange
- Change the output of generators correct answers - Shed load
- Reduce Interchange
- Change the output of generators
Why is it necessary to report SOL and IROL exceedances to the Reliability Coordinator?
- The Reliability Coordinator will then evaluate actions being taken and direct additional
corrective actions as needed
- To shift responsibility for fixing the issue to the Reliability Coordinator
- The Reliability Coordinator will then notify neighboring Reliability Coordinators to open
various circuit breakers
- The Reliability Coordinator will then determine consequences and penalties for the exceedance
correct answers - The Reliability Coordinator will then evaluate actions being taken and direct
additional corrective actions as needed
Which are the three types of limits to consider when determining system limits?
- Voltage
- Angle stability
- Thermal
- Impedance correct answers - Voltage
- Angle stability
- Thermal
, A contingency results in the exceedance of an IROL. What could be the result if the IROL is
allowed to be exceeded longer than its Tv?
- Failure of the transmission line
- Loss of power to a local area
- Interruption of power to a large part of the BES
- Voltage below its normal Operating range correct answers - Interruption of power to a large
part of the BES
A Transmission Operator has scheduled a short, temporary outage of the SCADA system for a
software update at 22:00 tonight. Which of the following actions is required of the Transmission
Operator?
- Request permission from NERC Operating Committee
- Notify the Reliability Coordinator and known impacted entities of the outage
- Fully implement the Backup Control Center
- Request a level 1 Energy Emergency Alert correct answers - Notify the Reliability Coordinator
and known impacted entities of the outage
A transmission line trip results in a SOL exceedance and the Transmission Operator implements
the Operating Plan for the SOL. What should the Transmission Operator do next?
- Update the map board
- Inform the Reliability Coordinator of actions taken
- Make a fresh pot of coffee
- File event report to NERC within 24 hours correct answers - Inform the Reliability Coordinator
of actions taken
No IROL can have an IROL TV that exceeds __________?
15 minutes
30 minutes
90 minutes
60 minutes correct answers 30 minutes
A Transmission Operator notified the Generator Operator to change the MW output of their
hydro plant to relieve an overloaded transmission line. That is an example of which of the
following?
Operating Plan
Operating Instruction
System Configuration
Operating Directive correct answers Operating Instruction
What is an Operating Instruction?
- Any conversation between two or more parties related to the reliability of the BES
- A documented procedure or process for addressing an IROL exceedance
- Real-time Operating personnel command to change or preserve the state of an element of the
BES
- Managers command to shed load correct answers - Real-time Operating personnel command to
change or preserve the state of an element of the BES
A Generator Operator receives an Operating Instruction from its Transmission Operator to bring
on additional generation to mitigate a low voltage situation. The Generator Operator must
comply with the Operating Instruction unless:
- The Generator Operator disagrees with the Operating Instruction
- It results in safety concerns or environmental violations
- It has serious financial implications
- The operator is in the middle of shift turnover correct answers - It results in safety concerns or
environmental violations
TOP 001, R3
The Transmission Operator experiences an unexpected line outage which results in the
subsequent loading of a parallel line at 101% of its SOL, what action should the Transmission
Operator take?
- Inform the Reliability Coordinator
- Wait until load decreases
- Take the appropriate action to return the system to within normal limits
- Open the overloaded line correct answers - Inform the Reliability Coordinator
- Take the appropriate action to return the system to within normal limits
Following a contingency or other event resulting in an Interconnection Reliability Operating
Limit (IROL) violation, the Transmission Operator shall return to within the IROL as soon as
possible, but no longer than ______.
- 15 minutesIts
- IROL Tv
- 30 minutes
- 60 minutes correct answers Its IROL Tv
A Transmission Operator performs a Real-time Assessment that identifies a SOL exceedance.
What should the Transmission Operator do next?
- Shed load required to return to the SOL limit
,- Contact the Reliability Coordinator and ask for assistance
- Isolate the line with the exceedance
- Initiate its Operating Plan to mitigate the SOL exceedance correct answers - Initiate its
Operating Plan to mitigate the SOL exceedance
When another Transmission Operator requests emergency actions to be implemented in your
area, what is the expectation?
- The requesting TOP has also implemented emergency actions
- You assist immediately without asking questions
- The Reliability Coordinator must make the request
- Uncontrolled cascading outages are imminent correct answers - The requesting TOP has also
implemented emergency actions
Which of the following actions would a Transmission Operator be expected to take, or direct
others to take, to mitigate SOL and IROL violations? Select all that apply.
- Shed load
- Change limit
- Disconnect from neighbors
- Reduce Interchange
- Change the output of generators correct answers - Shed load
- Reduce Interchange
- Change the output of generators
Why is it necessary to report SOL and IROL exceedances to the Reliability Coordinator?
- The Reliability Coordinator will then evaluate actions being taken and direct additional
corrective actions as needed
- To shift responsibility for fixing the issue to the Reliability Coordinator
- The Reliability Coordinator will then notify neighboring Reliability Coordinators to open
various circuit breakers
- The Reliability Coordinator will then determine consequences and penalties for the exceedance
correct answers - The Reliability Coordinator will then evaluate actions being taken and direct
additional corrective actions as needed
Which are the three types of limits to consider when determining system limits?
- Voltage
- Angle stability
- Thermal
- Impedance correct answers - Voltage
- Angle stability
- Thermal
, A contingency results in the exceedance of an IROL. What could be the result if the IROL is
allowed to be exceeded longer than its Tv?
- Failure of the transmission line
- Loss of power to a local area
- Interruption of power to a large part of the BES
- Voltage below its normal Operating range correct answers - Interruption of power to a large
part of the BES
A Transmission Operator has scheduled a short, temporary outage of the SCADA system for a
software update at 22:00 tonight. Which of the following actions is required of the Transmission
Operator?
- Request permission from NERC Operating Committee
- Notify the Reliability Coordinator and known impacted entities of the outage
- Fully implement the Backup Control Center
- Request a level 1 Energy Emergency Alert correct answers - Notify the Reliability Coordinator
and known impacted entities of the outage
A transmission line trip results in a SOL exceedance and the Transmission Operator implements
the Operating Plan for the SOL. What should the Transmission Operator do next?
- Update the map board
- Inform the Reliability Coordinator of actions taken
- Make a fresh pot of coffee
- File event report to NERC within 24 hours correct answers - Inform the Reliability Coordinator
of actions taken
No IROL can have an IROL TV that exceeds __________?
15 minutes
30 minutes
90 minutes
60 minutes correct answers 30 minutes
A Transmission Operator notified the Generator Operator to change the MW output of their
hydro plant to relieve an overloaded transmission line. That is an example of which of the
following?
Operating Plan
Operating Instruction
System Configuration
Operating Directive correct answers Operating Instruction