CSE 360 QUIZ 4 | LATEST STUDY | QUESTIONS AND
ANSWERS | 2026 UPDATES
Software deteriorates due to...(select all the apply)
Excessive usage
Changes that degrade the code structure
Changes that degrade the design
Changes that potentially incorporate more bugs
Changes that add new features - ANSWER- Changes that degrade the code structure
Changes that degrade the design
Changes that potentially incorporate more bugs
What are the two broad kinds of software products (select those that apply)?
Mobile applications
Generic products
Customized products
Embedded systems
Web applications - ANSWER- Generic products
,Customized products
Which of the following is not a major software process activity?
Software Development
Software Testing
Software Evolution
Software Specification
Software Validation - ANSWER- Software Testing
Which of the following is the UML modeling tool that is required we use in CSE360?
Astah
Any digital drawing application that supports the UML figures and connectors as well as text
Jira
Microsoft Word
Lucidchart - ANSWER- Astah
What is the percentage contribution from the Midterm and the Final exam toward the final
grade? - ANSWER- 40
According to the article "Software Engineering not CS", the material cost of other engineering
products is about 50% compared to the almost 100% cost of labor in software engineering. Due
to huge labor costs, software projects need to focus more on.......(select all that apply)
Flexibility to make mid-project feature-set changes
Team members with graduate degrees
Finalize all the software features before start developing the software
, Small team size
Flexibility to use the best tools available
Predictable delivery dates - ANSWER- Flexibility to make mid-project feature-set changes
Small team size
Predictable delivery dates
Which of the following statements are true about the course grades (select all that apply)?
There are no extra-credit assignments in this course.
If your grade is less than 0.5% away from the next grade, the percentage will be rounded up.
You may request a review of an assignment grade until the date of the final exam.
Regardless of the distribution of the grades, the grades will not be curved.
Participation [in-class activities with submissions] during scheduled class time is graded. -
ANSWER- There are no extra-credit assignments in this course.
Regardless of the distribution of the grades, the grades will not be curved.
Participation [in-class activities with submissions] during scheduled class time is graded.
Which of the following are required tools for the Team Project (Select all that apply)
ANSWERS | 2026 UPDATES
Software deteriorates due to...(select all the apply)
Excessive usage
Changes that degrade the code structure
Changes that degrade the design
Changes that potentially incorporate more bugs
Changes that add new features - ANSWER- Changes that degrade the code structure
Changes that degrade the design
Changes that potentially incorporate more bugs
What are the two broad kinds of software products (select those that apply)?
Mobile applications
Generic products
Customized products
Embedded systems
Web applications - ANSWER- Generic products
,Customized products
Which of the following is not a major software process activity?
Software Development
Software Testing
Software Evolution
Software Specification
Software Validation - ANSWER- Software Testing
Which of the following is the UML modeling tool that is required we use in CSE360?
Astah
Any digital drawing application that supports the UML figures and connectors as well as text
Jira
Microsoft Word
Lucidchart - ANSWER- Astah
What is the percentage contribution from the Midterm and the Final exam toward the final
grade? - ANSWER- 40
According to the article "Software Engineering not CS", the material cost of other engineering
products is about 50% compared to the almost 100% cost of labor in software engineering. Due
to huge labor costs, software projects need to focus more on.......(select all that apply)
Flexibility to make mid-project feature-set changes
Team members with graduate degrees
Finalize all the software features before start developing the software
, Small team size
Flexibility to use the best tools available
Predictable delivery dates - ANSWER- Flexibility to make mid-project feature-set changes
Small team size
Predictable delivery dates
Which of the following statements are true about the course grades (select all that apply)?
There are no extra-credit assignments in this course.
If your grade is less than 0.5% away from the next grade, the percentage will be rounded up.
You may request a review of an assignment grade until the date of the final exam.
Regardless of the distribution of the grades, the grades will not be curved.
Participation [in-class activities with submissions] during scheduled class time is graded. -
ANSWER- There are no extra-credit assignments in this course.
Regardless of the distribution of the grades, the grades will not be curved.
Participation [in-class activities with submissions] during scheduled class time is graded.
Which of the following are required tools for the Team Project (Select all that apply)