ACI Concrete Field-Testing Technician Exam Questions & Answers

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
19-01-2026
Escrito en
2025/2026

The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - True The temperature of concrete may be measured in a wall form. True of False - True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - False What must be done to the sample container prior to sampling the concrete? - Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - False STARTING SECTION C172 - Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Stationary mixers, paving mixers, revolving drum mixers, open top mixers, and continuous mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - 15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - 15 The concrete sample must be protected from contamination and _____. - Rapid evaporation The minimum size sample for making strength test specimens is _____. - 28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - 5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - False The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - Middle When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - Wet sieved STARTING SECTION C143 - The slump test is applicable to plastic concrete with a maximum size aggregate of _____. - 1.5 in. [37.5 mm] When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____. - Removed by wet sieving the sample over 1.5 in. [37.5 mm] sieve The mold for making the slump test is in the shape of _____. - The frustum of a cone The height of the slump mold is _____. - 12 in. [300 mm] The interior surface of the slump mold is allowed to have minor irregularities. True or False? - False For use in the slump test, the end or both ends of the tamping rod must be _____. - Rounded to a hemispherical tip The sample of concrete for use in making the slump test must be obained in accordance with ASTM Standard _____. - C172, Standard Practice for Sampling Freshly Mixed Concrete The slump mold should be in a dry condition before beginning the test. True or False? - False The surface on which the slump mold will be placed must be _____. - Flat, level, moist, nonabsorbent, and free of vibration The slump mold is filled in _____ layers. - 3 Each layer should fill approximately _____ the volume of the mold. - One-third The approximate concrete depth (in verticle distance) after placing the first layer is _____, and the second layer is _____. - 2 5/8 in. [70 mm], 6 1/8 in. [160 mm] What is the specified number of roddings for each layer? - 25 How deep should the tamping rod penetrate into each layer? - Rod each layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 in. [25 mm]

Mostrar más Leer menos
Institución
ACI Concrete Field Testing Technician Level 1
Grado
ACI Concrete field testing technician level 1










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACI Concrete field testing technician level 1
Grado
ACI Concrete field testing technician level 1

Información del documento

Subido en
19 de enero de 2026
Número de páginas
21
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • aci
  • aci concrete
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Terry75 NURSING
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
64
Miembro desde
1 año
Número de seguidores
0
Documentos
1878
Última venta
19 horas hace

4.5

13 reseñas

5
10
4
1
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes