• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

SWPPP Test Exam Questions And Answers |Well Elaborated Solutions|

Document preview thumbnail
Preview 2 out of 9 pages

SWPPP Test Exam Questions And Answers |Well Elaborated Solutions| A system of erosion and sediment control BMP's is often called a - ANSWER Treatment train Accelerated erosion that is most often caused by - ANSWER -Humans Of the following factors of erosion the one a contractor has the most control over - ANSWER -ground cover Of the following the one that is primary erosion and sediment control objective - ANSWER -Minimize the extent and duration of soil exposure stablize to start areas quickly If you have questions or concerns about the BMP's specified in your project SWPPP you should - ANSWER -contact your SWPPP designer When installing and maintaining a check dam make sure - ANSWER -The low point of the check that was in the middle of a channel Storm drain inlet protection is intended tp - ANSWER -Pond water in allow sediment to settle out To reduce the possibility of undercutting you should - ANSWER -Install filter fabric under BMPs and stormwater conveyance Sediment basins are often converted to - ANSWER -Detention and retention ponds Concrete water washout has a high - ANSWER -PH Proper spell management should include all the following except - ANSWER Installation of spill pit on your construction site The best location for a portable toilet on your construction site is - ANSWER -On level ground in a low construction traffic area A common potential pollutant in a vehicle maintence area is - ANSWER Petroleum Which material management practice may address both sediment and dust control - ANSWER -street cleaning Temporary stabilization should be implemented - ANSWER -On all disturbed areas that will remain in active for 14 days or more A key first step before installing a roll erosion control product of our RECP is - ANSWER -Properly preparing the ground surface Which of the following ground covers is best applied to moderate to steep slopes and in stormwater conveyances - ANSWER -rolled erosion RECPS What percentage vegetation density is typically required to establish for stabilization - ANSWER -70% When inspecting silt fence look for all but one of the following defenciencies deficiencies - ANSWER -Track out A fiber roll or wattle is intended to - ANSWER -Capture sediment from a seat for low and slow runoff velocity Which of the following is not considered when removing temporary sediment basins - ANSWER -Keep the overflow or spillway in tact The primary purpose of a construction exit - ANSWER -To remove sediment from the consrtuction site vehicles and prevent track out construction BMP's identified by the SWPPP inspector as needing repairs must be corrected and documented - ANSWER -In a timely manner and in compliance with the SWPPP The law that set into place stormwater regulations in the 1970s is - ANSWER -The Clean Water Act

Content preview

SWPPP Test Exam Questions And
Answers |Well Elaborated Solutions|

A system of erosion and sediment control BMP's is often called a - ANSWER -
Treatment train


Accelerated erosion that is most often caused by - ANSWER -Humans


Of the following factors of erosion the one a contractor has the most control over -
ANSWER -ground cover


Of the following the one that is primary erosion and sediment control objective -
ANSWER -Minimize the extent and duration of soil exposure stablize to start areas
quickly


If you have questions or concerns about the BMP's specified in your project
SWPPP you should - ANSWER -contact your SWPPP designer


When installing and maintaining a check dam make sure - ANSWER -The low
point of the check that was in the middle of a channel


Storm drain inlet protection is intended tp - ANSWER -Pond water in allow
sediment to settle out

, To reduce the possibility of undercutting you should - ANSWER -Install filter
fabric under BMPs and stormwater conveyance


Sediment basins are often converted to - ANSWER -Detention and retention
ponds


Concrete water washout has a high - ANSWER -PH


Proper spell management should include all the following except - ANSWER -
Installation of spill pit on your construction site


The best location for a portable toilet on your construction site is - ANSWER -On
level ground in a low construction traffic area


A common potential pollutant in a vehicle maintence area is - ANSWER -
Petroleum


Which material management practice may address both sediment and dust control
- ANSWER -street cleaning


Temporary stabilization should be implemented - ANSWER -On all disturbed
areas that will remain in active for 14 days or more


A key first step before installing a roll erosion control product of our RECP is -
ANSWER -Properly preparing the ground surface

Document information

Uploaded on
January 16, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeGuru
1.5
(2)
Sold
17
Followers
0
Items
2358
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions