a flooring contractor cannot install what type of tile Ans: ceramic tile
the most common test for squareness of a room is Ans: 3-4-5 triangle
in job preparation the room temperature should be-------- 2 days before
© 2026 Assignment Expert
and 2-3 days after Ans: minimum 65 degrees and maximum 95 degrees
when concrete floor is 18" above ground its called Ans: above grade or
Guru01 - Stuvia
suspended
if floor is lower than surrounding ground it is called Ans: below grade
concrete floor slab that is poured on the ground is called Ans: on grade
a new concrete slab should be allowed to cure for at least----- before
installing Ans: 60-120 days
3 methods to measure moisture Ans: the crystal method, the glass
method, the mats method
too much alkalinity on a concrete surface can prevent adhesives from
bonding ph level must be at Ans: 8.0or below
concrete plank subfloors must be finished with Ans: 2-3 inches of
concrete topping
, For Expert help and assignment handling,
2
with concrete plank subfloors what is not recomended Ans: mastic
underlayments
priming is not a Ans: waterproof process
the purpose of priming is Ans: better adhesive bond
when a concrete floor is painted you must Ans: always remove paint
before installing
© 2026 Assignment Expert
if installing carpet in top of resilient floor you must Ans: remove all
grease, wax, glue
Guru01 - Stuvia
never install felt underlying over old resilient floor because Ans: resulting
surface will be too soft
carpet, resilient floor, laminate floor can be installed over Ans: terrazzo
or tile floors
to prepare terrazzo floors you must Ans: remove all wax, sealers and
roughened surface
wood floors must be installed 18' above the ground for Ans: adequate
ventilation
types of woven carpets Ans: velvet, wilton, Axminster, chenille
needle punch carpet is called Ans: indoor-outdoor carpet
the durability of a carpet is affected by Ans: the density of the pile tufts
1
contractors license Questions and Answers
(100% Correct Answers) Already Graded A+
a flooring contractor cannot install what type of tile Ans: ceramic tile
the most common test for squareness of a room is Ans: 3-4-5 triangle
in job preparation the room temperature should be-------- 2 days before
© 2026 Assignment Expert
and 2-3 days after Ans: minimum 65 degrees and maximum 95 degrees
when concrete floor is 18" above ground its called Ans: above grade or
Guru01 - Stuvia
suspended
if floor is lower than surrounding ground it is called Ans: below grade
concrete floor slab that is poured on the ground is called Ans: on grade
a new concrete slab should be allowed to cure for at least----- before
installing Ans: 60-120 days
3 methods to measure moisture Ans: the crystal method, the glass
method, the mats method
too much alkalinity on a concrete surface can prevent adhesives from
bonding ph level must be at Ans: 8.0or below
concrete plank subfloors must be finished with Ans: 2-3 inches of
concrete topping
, For Expert help and assignment handling,
2
with concrete plank subfloors what is not recomended Ans: mastic
underlayments
priming is not a Ans: waterproof process
the purpose of priming is Ans: better adhesive bond
when a concrete floor is painted you must Ans: always remove paint
before installing
© 2026 Assignment Expert
if installing carpet in top of resilient floor you must Ans: remove all
grease, wax, glue
Guru01 - Stuvia
never install felt underlying over old resilient floor because Ans: resulting
surface will be too soft
carpet, resilient floor, laminate floor can be installed over Ans: terrazzo
or tile floors
to prepare terrazzo floors you must Ans: remove all wax, sealers and
roughened surface
wood floors must be installed 18' above the ground for Ans: adequate
ventilation
types of woven carpets Ans: velvet, wilton, Axminster, chenille
needle punch carpet is called Ans: indoor-outdoor carpet
the durability of a carpet is affected by Ans: the density of the pile tufts