100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

WGU C207 OA Practice Questions 2026 | Data-Driven Decision Making Study Guide

Puntuación
-
Vendido
-
Páginas
26
Grado
A+
Subido en
13-01-2026
Escrito en
2025/2026

Prepare for WGU C207 OA (Objective Assessment) with a comprehensive 2026 study guide featuring high-yield practice questions and detailed explanations. Focus on data analysis, predictive and prescriptive analytics, Excel functions, and decision-making frameworks. Learn to interpret business data, apply quantitative methods, and make data-driven recommendations for organizational decisions. Ideal for WGU students seeking confidence and success on the C207 Objective Assessment.

Mostrar más Leer menos










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Información del documento

Subido en
13 de enero de 2026
Número de páginas
26
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • decision maki

Vista previa del contenido

1|Page


WGU C207 OA – Practice Question (NEW UPDATED VERSION) LATEST ACTUAL
EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED QUESTIONS AND
ANSWERS)- GUARANTEED PASS A+ UPDATED 2026



1. A factory has an average demand of 400 units/week. Ordering cost = $40, holding cost =
$2/unit. EOQ = ?
A. 200
B. 282
C. 400
D. 447
Answer: B (282 units)
Rationale: EOQ = √(2DS/H) → √(2×400×40/2) = √16000 ≈ 126.5 → Wait, calculate carefully:
√(240040/2) = √(16000) = 126.5 Actually 127 units. Correct Answer = 127.
Updated Answer: 127 units.



2. In a flowchart, a triangle symbol represents:
A. Inspection
B. Delay
C. Storage
D. Operation
Answer: B (Delay)
Rationale: Standard symbols: triangle = delay, rectangle = operation, diamond = decision.



3. Project task B depends on task A (duration 5 days). Task C depends on B (duration 3
days). Earliest finish for C?
A. 5 days
B. 3 days
C. 8 days
D. 10 days
Answer: C (8 days)
Rationale: Task durations accumulate along dependencies: 5 + 3 = 8 days.



4. A company uses JIT inventory. Likely effect?
A. Increased lead times
B. Reduced inventory costs
C. Higher waste


2026 2027 GRADED A+

,2|Page


D. Overproduction
Answer: B (Reduced inventory costs)
Rationale: JIT minimizes inventory and reduces holding costs.



5. A Pareto chart shows the most frequent defects. The top 20% causes produce 80% of
defects. This demonstrates:
A. 50/50 rule
B. 80/20 principle
C. Process variability
D. Lean principle
Answer: B (80/20 principle)
Rationale: Pareto charts visualize the 80/20 rule to focus improvement efforts.



6. In a Gantt chart, a bar represents:
A. Task duration
B. Cost
C. Inventory
D. Quality inspection
Answer: A (Task duration)
Rationale: Gantt charts display tasks along a timeline.



7. Inventory peaks at 500 units, safety stock 100 units. Reorder point = ?
A. 200
B. 100
C. 300
D. 50
Answer: B (100 units)
Rationale: Reorder point = safety stock + expected demand during lead time.



8. Forecasted demand = 1000, actual = 900 → forecast error = ?
A. +100
B. –100
C. 0
D. 900
Answer: B (–100)
Rationale: Error = Forecast – Actual = 1000 – 900 = 100 → check negative: Forecast – Actual =
100 → Positive 100 Corrected: +100.



2026 2027 GRADED A+

, 3|Page




9. Process capability index (Cpk) = 1.2 → meaning?
A. Process incapable
B. Meets specifications
C. High variability
D. Process unstable
Answer: B (Meets specifications)
Rationale: Cpk >1 indicates process is capable and within limits.



10. EOQ problem: Weekly demand = 600, ordering cost = $30, holding cost = $5/unit. EOQ
=?
A. 60
B. 120
C. 269
D. 300
Answer: C (269 units)
Rationale: EOQ = √(2DS/H) → √(2×600×30/5)=√7200≈84.85 → Wait recalc: 260030=36,000
/5=7,200 → √7200 ≈ 84.85 Correct Answer: 85 units.



11. A process has a bottleneck at workstation 2. Solution?
A. Reduce capacity at station 2
B. Increase capacity at station 2
C. Remove station 1
D. Skip inspections
Answer: B (Increase capacity)
Rationale: Bottleneck limits throughput; increasing its capacity improves output.



12. A process flow diagram uses a rectangle → represents:
A. Storage
B. Operation
C. Inspection
D. Delay
Answer: B (Operation)
Rationale: Rectangles indicate tasks/operations.



13. Lead time demand = 150 units, safety stock = 50 → reorder point = ?
A. 150


2026 2027 GRADED A+
$28.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEO808 nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1386
Miembro desde
4 año
Número de seguidores
1123
Documentos
9914
Última venta
9 horas hace
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 reseñas

5
107
4
35
3
36
2
11
1
32

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes